My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-168A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-168A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 11:08:59 AM
Creation date
10/15/2018 3:58:30 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/11/2018
Control Number
2018-168A
Agenda Item Number
8.W.
Entity Name
Southern Coatings, Inc.
Subject
West Wastewater Treatment Plant Roof Replacement
Area
8405 8th Street
Project Number
IRC-1803
Bid Number
2018074
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01 11 00 <br />PART GENERAL <br />1.01 WORK COVERED BY CONTRACT DOCUMENTS <br />A. Project Name: Indian River County West WWTP Roof Replacement <br />B. Project Address: 8405 8"' Street, Vero Beach, Florida, 32968 <br />C. Owner: Indian River County <br />D. Engineer: The Contract Documents, dated July 13, 2018, were prepared by REI Engineers, <br />Inc. <br />E. This work includes the provision of all labor, material, equipment, supervision and <br />administration to integrate the work outlined in this project manual into the total building <br />system such that no leakage into the system occurs. In general, the scope of work in the <br />Base Bid will include: <br />Steep -Slope Shingle Roof Areas <br />a. Removal and disposal of all existing shingles, underlayment, down to the <br />wood deck. <br />b. Removal and disposal of all sheet metal flashings and trim. <br />C. Removal and disposal of all gutters and downspouts. <br />d. Removal and disposal of all gutter edge wood facia boards. <br />e. Repair of existing substrates under unit price/allowance work. <br />f. Provide new sheathing, self -adhered underlayment, shingles, sheet metal <br />flashings and trim, gutters and downspouts. <br />2. Remove the existing lightning protection/grounding system prior to <br />commencement of roof replacement work. Upon completion of flashing and sheet <br />metal installation, all new or existing parts, components or materials will be <br />reinstalled or installed to meet UL requirements at the time of initial installation. <br />3. Repair of existing gable wall sheathing under unit price/allowance work. <br />F. Asbestos Containing Roofing Materials (ACRM): <br />It is the intention of these specifications that no asbestos bearing materials be <br />incorporated into the work. In the event the contractor should determine <br />unanticipated asbestos bearing materials to be present in the existing building <br />components, Contractor is to stop all work in the affected area, notify the Engineer <br />and Owner, and provide temporary protection as required. Costs incurred, if any, <br />due to the presence of hidden and/or unanticipated asbestos bearing materials will <br />be authorized by Change Order to this contract. <br />G. The contractor is responsible for all electrical, plumbing, mechanical, and other related <br />trade work necessary to facilitate project operations.. Contractor is responsible for re- <br />locating any and all conduit, HVAC equipment, curbs, and/or plumbing necessary to <br />comply with the requirements of these documents. All work shall conform to the <br />requirements of the current Building Code approved in the State of the project location. <br />H. General requirements and specific recommendations of the material manufacturers are <br />Indian River County West WWTP <br />Roof Replacement 01 1100-1 Summary of Work <br />
The URL can be used to link to this page
Your browser does not support the video tag.