My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-168A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-168A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 11:08:59 AM
Creation date
10/15/2018 3:58:30 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/11/2018
Control Number
2018-168A
Agenda Item Number
8.W.
Entity Name
Southern Coatings, Inc.
Subject
West Wastewater Treatment Plant Roof Replacement
Area
8405 8th Street
Project Number
IRC-1803
Bid Number
2018074
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
included as part of these specifications. The manufacturers' specifications are the <br />minimum standards required for the completed systems. Specific items listed herein may <br />improve the standards required by the manufacturers and will take precedence where their <br />compliance will not affect the manufacturers' guarantee or warranty provisions. <br />1.02 CONTRACT <br />A. Project will be constructed under a single prime general construction contract. <br />1.03 SITE INVESTIGATION <br />A. The Contractor acknowledges that he has satisfied himself as to the nature and location of <br />the Work, the general and local conditions, particularly those bearing upon transportation, <br />disposal, handling and storage of materials, availability of labor, water, electric power, <br />roads and uncertainties of weather, ground water table or similar physical conditions at the <br />site, the conformation and condition of the ground, the character, quality and quantity of <br />surface and subsurface materials to be encountered, the character of equipment and <br />facilities needed prior to and during the prosecution of the Work and all other matters which <br />can in any way affect the Work or the cost thereof under this Contract. Any failure by the <br />Contractor to acquaint himself with all the available information concerning these <br />conditions will not relieve him from responsibility for estimating properly the difficulty or <br />cost of successfully performing the Work. Field measurements shall be taken at the site by <br />the Contractor to verify all data and conditions affected by the Work. <br />1.04 SPECIFICATION FORMATS AND CONVENTIONS <br />A. Specification Format: The Specifications are organized into Divisions and Sections using <br />the 49 -division format and CSUCSC's "Masterformat" numbering system. <br />Section Identification: The Specifications use section numbers and titles to cross- <br />reference Contract Documents. Sections in the Project Manual are in numeric <br />sequence.; however, the sequence is incomplete. Consult the Table of Contents at <br />the beginning of the Project Manual. <br />B. Specification Content: The Specifications use certain conventions for the style of language <br />and the intended meaning of certain terms, words, and phrases when used in particular <br />situations. These conventions are as follows: <br />Abbreviated Language: Language used in the Specifications and other Contract <br />Documents is abbreviated. Words and meanings shall be interpreted as <br />appropriate. Words implied, but not stated, shall be inferred as the sense requires. <br />Singular words shall be interpreted as plural, and plural words shall be interpreted <br />as singular where applicable as the context of the Contract Documents indicates. <br />Imperative mood and streamlined language are generally used in the <br />Specifications. Requirements expressed in the imperative mood are to be <br />performed by Contractor. Occasionally, the indicative or subjunctive mood may <br />be used in the Section Text for clarity to describe responsibilities that must be <br />fulfilled indirectly by Contractor or by others when so noted. <br />a. The words "shall," "shall be," or "shall comply with," depending on the <br />context, are implied where a colon (:) is used within a sentence or phrase. <br />PART 2 PRODUCTS (NOT USED) <br />Indian River County West WWTP <br />Roof Replacement 01 1100-2 Summary of Work <br />
The URL can be used to link to this page
Your browser does not support the video tag.