My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-168A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-168A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 11:08:59 AM
Creation date
10/15/2018 3:58:30 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/11/2018
Control Number
2018-168A
Agenda Item Number
8.W.
Entity Name
Southern Coatings, Inc.
Subject
West Wastewater Treatment Plant Roof Replacement
Area
8405 8th Street
Project Number
IRC-1803
Bid Number
2018074
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 013100 <br />PROJECT MANAGEMENT AND COORDINATION <br />PART1 GENERAL <br />1.01 <br />1.02 <br />A. <br />SECTION INCLUDES <br />This Section includes administrative provisions for coordinating construction operations <br />on Project including, but not limited to, the following: <br />1. General project coordination procedures. <br />2. Coordination. <br />3. Administrative and supervisory personnel. <br />4. Project meetings. <br />5. Weekly Reports <br />COORDINATION <br />A. Coordinate construction operations with those of other contractors and entities to ensure <br />efficient and orderly installation of each part of the Work. The Contractor shall coordi- <br />nate its operations with those included in different Sections that depend on each other for <br />proper installation, connection, and operation. <br />1. Schedule construction operations in sequence required to obtain the best results <br />where installation of one part of the Work depends on installation of other com- <br />ponents, before or after its own installation. <br />2. Coordinate installation of different components with other contractors to ensure <br />maximum accessibility for required maintenance, service, and repair. <br />3. Make adequate provisions to accommodate items scheduled for later installation. <br />B. Progress Reporting: The scheduling and sequence of all operations shall be carefully co- <br />ordinated with the Owner and Engineer. <br />C. If necessary, prepare memoranda for distribution to each party involved, outlining special <br />procedures required for coordination. Include such items as required notices, reports, and <br />list of attendees at meetings. <br />Prepare similar memoranda for Owner and separate contractors if coordination of <br />their Work is required. <br />D. Administrative Procedures: Coordinate scheduling and timing of required administrative <br />procedures with other construction activities and activities of other contractors to avoid <br />conflicts and to ensure orderly progress of the Work. Such administrative activities in- <br />clude, but are not limited to, the following: <br />1. Preparation of Contractor's Construction Schedule. <br />2. Preparation of the Schedule of Values. <br />3. Installation and removal of temporary facilities and controls. <br />4. Delivery and processing of submittals. <br />5. Progress meetings. <br />6. Pre -Construction conference. <br />7. Pr6-installation conferences. <br />8. Project closeout activities. <br />Indian River County West WWTP <br />Roof Replacement 01 31 00-1 Project Management and Coordination <br />