1.03 PROJECT MEETINGS <br />A. Pre -Construction Meeting <br />1. A Pre -Construction Meeting will be scheduled as soon as possible after the award <br />of the contract. The Engineer's Representative will compile minutes of the meet- <br />ing, and will furnish a copy of the minutes to the Contractor and each person pre- <br />sent. The Contractor may make and distribute such other copies as he wishes. <br />2. Attendance: Contractor Project Manager, Job Superintendent and Job Foreman, <br />Owner, Engineer's Representative, manufacturer's representatives, installers of <br />related work and all other persons concerned with the installation and perfor- <br />mance. The Contractor shall also provide three (3) local telephone numbers, <br />which may be used to contact the Contractor or his authorized representative in <br />the event of an emergency after normal business hours. <br />3. Minimum Agenda: Organizational arrangement of Contractor's forces and per- <br />sonnel, and those of subcontractors, materials suppliers, and the Project Manager; <br />channels and procedures for communication; construction schedule, including <br />sequence of critical work; contract documents, including distribution of required <br />copies of Drawings and revisions; processing of Shop Drawings and other data <br />submitted to the Project Manager for review; rules and regulations governing <br />performance of the work and procedures for safety, first aid, security, quality <br />control, housekeeping and related matters. <br />B. Progress Meetings <br />1. The Contractor shall attend bi-monthly progress meetings for the purpose of in- <br />forming the Owner and the Engineer regarding the status of the project. The En- <br />gineer will compile minutes of the meeting, and will furnish a copy of the <br />minutes to the Contractor and each person present. The Contractor may make <br />and distribute such other copies as he wishes. <br />2. Attendance: Owner, Engineer, Contractor, Job Superintendent, material Suppli- <br />er, and Subcontractors, as appropriate. Each representative shall be thoroughly <br />familiar with the status of the project and shall be prepared to discuss and act up- <br />on any situations, which may arise. The time, date and location of these meet- <br />ings will be established during pre -construction conference. The Contractor shall <br />provide an updated job progress schedule at each weekly meeting. <br />3. Minimum Agenda: Review of work progress; field observations, problems, and <br />decisions; identification of problems which impede planned progress; mainte- <br />nance of progress schedule; corrective measures to regain projected schedules; <br />planned progress during succeeding work period; coordination of projected pro- <br />gress; maintenance of quality and work standards; processing of field decisions <br />and Change Orders; effect of proposed changes on progress, schedule, and coor- <br />dination; other business relating to work. <br />C. Substantial Completion Inspection Meeting <br />1. Scheduled by Owner and Engineer upon written notification of substantial com- <br />pletion of work from the Contractor. <br />2. Attendance: Owner, Engineer, Contractor, material manufacturer. <br />3. Minimum Agenda: Walkover inspection; verification of substantial completion; <br />identification of punch list items; identification of problems, which may impede <br />issuance of warranties. <br />4. Refer to Section 01 77 00 for other requirements. <br />Indian River County West WWTP <br />Roof Replacement 0131 00-2 Project Management and Coordination <br />