Laserfiche WebLink
3. Copy of Contractor's Certificate of Insurance <br />4. Copy of Construction Permits <br />5.. Roof Manufacturer's Acknowledgement Form (Section 00 62 33) <br />6. Copy of all warranties indicated in Section 01 77 00 to meet the requirements of <br />their respective specification section <br />7. Letter describing in detail any proposed changes, substitutions, or deviations <br />from the project or -manufacturer's specifications. A written explanation of why <br />substitutions should be considered is required. <br />8. Shop drawings or letter stating that the contractor will install materials as detailed <br />in the Contract Drawings unless properly authorized by the Engineer. <br />9. Steel Deck Repair/Securement (Section 05 31 23) <br />10. Rough Carpentry (Section 06 10 00) <br />11. Preparation for Reroofing (Section 07 01 50) <br />12. Pre -Construction Site Condition Video: Existing damaged/dysfunctional <br />components documentation including but not limited to; asphalt spills, windows, <br />walls, sidewalks, paving, ceilings, etc. Lack of submission prior to <br />commencement of work indicates Contractor has discovered no existing <br />damaged components and takes responsibility for any damages caused by <br />operations. <br />13. Roof Insulation (Section 07 22 16) <br />14. Thermoplastic Single Ply Roofing (Section 07 54 00) <br />15. Sheet Metal Flashing and Trim (Section 07 62 00) <br />16. Roof Accessories (Section 07 72 00) <br />17. Complete list of materials with Safety Data Sheets (SDS) <br />17��1 If►_��_CZ�J1il�y�.y <br />2.01 SUBMITTALS <br />A. General: Prepare and submit Submittals required herein and by individual Specification <br />Sections. <br />B. Product Data: Collect information into a single submittal for each element of <br />construction and type of product or equipment. <br />If information must be specially prepared for submittal because standard printed <br />data are not suitable for use, submit as Shop Drawings, not as Product Data. <br />Mark each copy of each submittal to show which products and options are <br />applicable. <br />Include the following information, as applicable: <br />a. Manufacturer's written recommendations. <br />b. Manufacturer's product specifications. <br />C. Manufacturer's installation instructions. <br />d. Manufacturer's catalog cuts. <br />e. Printed performance curves. <br />f. Operational range diagrams. <br />g. Compliance with recognized trade association standards. <br />h. Compliance with recognized testing agency standards. <br />C. Shop Drawings: Prepare Project -specific information, drawn accurately to scale. Do not <br />base Shop Drawings on reproductions of the Contract Documents or standard printed <br />data. <br />Indian River County West WWTP <br />Roof Replacement 01 3300-2 Submittal Procedures <br />