Laserfiche WebLink
work, shall be reported to the Engineer in order that prompt inspection may be made and <br />defects corrected. Commencement of work by a Contractor where such condition exists <br />will constitute acceptance of the other Contractor's work as being satisfactory in all respects <br />to receive the work commenced, except defects, which may later develop. Work of all <br />trades under this contract shall be closely coordinated in such a manner as to obtain the <br />best possible workmanship for the entire project. All components of the work shall be <br />installed in accordance with the best practices of the particular trade. The General Con- <br />tractor is responsible to advise the Owner sufficiently in advance of operations to allow for <br />assignment of personnel. <br />C. Materials or methods described by words which, when applied, have a well known tech- <br />nical or trade meaning will be held to refer to such recognized standard. Standard specifi- <br />cations or manufacturer's literature, when referenced, shall be of the latest revision or print- <br />ing unless otherwise stated, and are intended to establish the minimum requirements ac- <br />ceptable. <br />D. All materials shall be new, all materials and workmanship shall be in every respect in ac- <br />cordance with the best modern practice. <br />E. When special makes or grades of material which are normally packaged by the supplier or <br />manufacturer are specified or accepted, such materials shall be delivered to the site in orig- <br />inal packages or containers with seals unbroken and labels intact and shall not be opened <br />until inspected and approved by the Engineer. Contractor shall notify the Engineer prior <br />to such material's delivery. <br />F. The Contractor's Foreman or Superintendent to maintain one complete set of the contract <br />documents and approved submittals on the job site. <br />G. Contractor shall be responsible to correct deficiencies identified by Engineer and non -con- <br />forming work within 24 hours of receipt of notification, either verbally or written, and <br />submit a plan of action for addressing the deficiencies and non -conforming work. Further <br />tear -off or commencement of other work shall not occur until all deficiencies and non- <br />conforming work are properly addressed. <br />H. Installer Qualifications: A firm or individual experienced in installing, erecting, or assem- <br />bling work similar in material, design, and extent to that indicated for this Project, whose <br />work has resulted in construction with a record of successful in-service performance. <br />Acceptable Contractor: <br />a. Be certified in writing for a minimum of two years by the roofing materials <br />manufacturer to install the primary roofing products. <br />b. Have a minimum of five (5) years experience in installing the same or <br />similar materials specified under the same firm name as that submitting <br />the bid. If requested, submit a copy of firm's Articles of Incorporation to <br />verify years in business. Also all crew workers on site are to be experi- <br />enced and have a working knowledge of the system being installed. <br />C. Principals of the firm to have a minimum of ten (10) years experience in <br />the estimating, supervision, management and administration of a contract- <br />ing firm engaged in the application of building envelope involving re- <br />moval of the existing building envelope systems. <br />d. Licensed by state work is occurring in for the type and dollar amount of <br />work contemplated by these Contract Documents. <br />e. Never filed bankruptcy or filed for protection from creditors. <br />Indian River County West WWTP <br />Roof Replacement 01 40 00-2 Quality Requirements <br />