Laserfiche WebLink
PART 2 <br />PART 3 <br />3.01 <br />A. <br />I—V <br />C. <br />4. Facilities for storage and field -curing of test samples. <br />5. Preliminary design mix proposed for use for material mixes that require control by <br />testing agency. <br />6. Security and protection for samples and for testing and inspecting equipment at <br />Project site. <br />PRODUCTS (NOT USED) <br />EXECUTION <br />REPAIR AND PROTECTION <br />General: On completion of testing, inspecting, sample taking, and similar services, repair <br />damaged construction and restore substrates and finishes. <br />Comply with the Contract Document requirements for Section 01 73 29 -Cutting <br />and Patching. <br />Protect construction exposed by or for quality -control service activities. <br />Repair and protection are Contractor's responsibility, regardless of the assignment of re- <br />sponsibility for quality -control services. <br />END OF SECTION 0140 00 <br />Indian River County West WWTP <br />Roof Replacement 01 4000-6 Quality Requirements <br />