My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-168A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-168A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 11:08:59 AM
Creation date
10/15/2018 3:58:30 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/11/2018
Control Number
2018-168A
Agenda Item Number
8.W.
Entity Name
Southern Coatings, Inc.
Subject
West Wastewater Treatment Plant Roof Replacement
Area
8405 8th Street
Project Number
IRC-1803
Bid Number
2018074
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
void existing warranties. <br />PART 2 PRODUCTS <br />2.01 MATERIALS <br />A. General: Comply with requirements specified in other Sections of these Specifications. <br />B. Existing Materials: Use materials identical to existing materials. For exposed surfaces, <br />use materials that visually match existing adjacent surfaces to the fullest extent possible. <br />If identical materials are unavailable or cannot be used, use materials that, when <br />installed, will match the visual and functional performance of existing materials. <br />PART 3 EXECUTION <br />3.01 EXADIINATION <br />A. Examine surfaces to be cut and patched and conditions under which cutting and patching <br />are to be performed. <br />1. Compatibility: Before patching, verify compatibility with and suitability of sub- <br />strates, including compatibility with existing finishes or primers. <br />2. Proceed with installation only after unsafe or unsatisfactory conditions have been <br />corrected. <br />3.02 PREPARATION <br />A. Temporary Support: Provide temporary support of Work to be cut. <br />B. Protection: Protect existing construction during cutting and patching to prevent damage. <br />Provide protection from adverse weather conditions for portions of Project that might be <br />exposed during cutting and patching operations. <br />C. Adjoining Areas: Avoid interference with use of adjoining areas or interruption of free <br />passage to adjoining areas. <br />D. Existing Services: Where existing services are required to be removed, relocated, or aban- <br />doned, bypass such services before cutting to minimize interruption of services to occupied <br />areas. <br />3.03 PERFORMANCE <br />A. General: Employ skilled workers to perform cutting and patching. Proceed with cutting <br />and patching at the earliest feasible time, and complete without delay. <br />Cut existing construction to provide for installation of other components or perfor- <br />mance of other construction, and subsequently patch as required to restore surfaces <br />to their original condition. <br />B. Cutting: Cut existing construction by sawing, drilling, breaking, chipping, grinding, and <br />similar operations, including excavation, using methods least likely to damage elements <br />retained or adjoining construction. <br />1. In general, use hand or small power tools designed for sawing and grinding, not <br />Indian River County West WWTP <br />Roof Replacement 01 7329-2 Cutting and Patching <br />
The URL can be used to link to this page
Your browser does not support the video tag.