My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-168A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-168A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 11:08:59 AM
Creation date
10/15/2018 3:58:30 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/11/2018
Control Number
2018-168A
Agenda Item Number
8.W.
Entity Name
Southern Coatings, Inc.
Subject
West Wastewater Treatment Plant Roof Replacement
Area
8405 8th Street
Project Number
IRC-1803
Bid Number
2018074
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
hammering and chopping. Cut holes and slots as small as possible, neatly to size <br />required, and with minimum disturbance of adjacent surfaces. Temporarily cover <br />openings when not in use. <br />2. Existing Finished Surfaces: Cut or drill from the exposed or finished side into <br />concealed surfaces. <br />3. Concrete or Masonry: Cut using a cutting machine, such as an abrasive saw or a <br />diamond -core drill. <br />4. Mechanical and Electrical Services: Cut off pipe or conduit in walls or partitions <br />to be removed. Cap, valve, or plug and seal remaining portion of pipe or conduit <br />to prevent entrance of moisture or other foreign matter after cutting. <br />5. Proceed with patching after construction operations requiring cutting are complete. <br />C. Patching: Patch construction by filling, repairing, refinishing, closing up, and similar op- <br />erations following performance of other Work. Patch with durable seams that are as invis- <br />ible as possible. Provide materials and comply with installation requirements specified in <br />other Sections of these Specifications. <br />1. Inspection: Where feasible, test and inspect patched areas after completion to <br />demonstrate integrity of installation. <br />2. Exposed Finishes: Restore exposed finishes of patched areas and extend finish <br />restoration into retained adjoining construction in a manner that will eliminate ev- <br />idence of patching and refinishing. <br />3. Floors and Walls: Where walls or partitions that are removed extend from one <br />finished area into another, patch and repair floor and wall surfaces in the new <br />space. Provide an even surface of uniform finish, color, texture, and appearance. <br />Remove existing floor and wall coverings and replace with new materials, if nec- <br />essary, to achieve uniform color and appearance. <br />a. Where patching occurs in a painted surface, apply primer and intermediate <br />paint coats over the patch and apply final paint coat over entire unbroken <br />surface containing the patch. Provide additional coats until patch blends <br />with adjacent surfaces. <br />4. Exterior Building Enclosure: Patch components in a manner that restores enclo- <br />sure to a weather tight condition. <br />5. Ceilings: Patch, repair, or re -hang existing ceilings as necessary to provide an <br />even -plane surface of uniform appearance. <br />D. Cleaning: Clean areas and spaces where cutting and patching are performed. Completely <br />remove paint, mortar, oils, putty and similar materials. <br />END OF SECTION 0173 29 <br />Indian River County West WWTP <br />Roof Replacement 01 73 29-3 Cutting and Patching <br />
The URL can be used to link to this page
Your browser does not support the video tag.