Laserfiche WebLink
SECTION 06 10 00 <br />ROUGH CARPENTRY <br />PART GENERAL <br />1.01 SECTION INCLUDES <br />A. Rough Carpentry work required to facilitate installation of new roof assembly including: <br />1. Replace damaged gable wall panel sheathing. <br />2. Removal and replacement of damaged, rotted or deteriorated rough carpentry with <br />pressure treated rough carpentry to match existing.. <br />3. Re-securement of existing wood plywood deck. <br />4. Re-securement of existing rough carpentry to remain in place. <br />5. Provide pressure treated wood blocking and plywood sheathing. <br />1.02 REFERENCES <br />A. Refer to the following references, current edition for specification compliance: <br />1. Florida Building Code <br />2. American Society for Testing and Materials (ASTM) <br />3. American Wood -Preserver's Association (AWPA) <br />a. AWPA E12 - Standard Method of Determining the Corrosion of Metal in <br />Contact with Wood. <br />b. AWPA M4 - Standard for the Care of Preservative Treated Wood <br />Products. <br />C. AWPA P5 - Standard for Waterborne Preservatives. <br />d. AWPA T1 - Use Category System: Processing and Treatment Standard. <br />e. AWPA Ul - Use Category System: User Specification for Treated Wood. <br />4. American Plywood Association (APA) <br />5. American National Standard <br />a. ANSUSPRI ES -1 Wind Design Standard for Edge Systems Used with Low <br />Slope Roofmg Systems <br />6. Underwriters Laboratories, Inc. (UL) <br />7. FM Global/Factory Mutual Research (FM) <br />1.03 DEFINITIONS <br />A. Rough Carpentry includes carpentry work not specified as part of other Sections and <br />generally not exposed. <br />B. KDAT: Kiln Dried After Treatment. <br />1.04 SUBMITTALS <br />A. Refer to Section 01 33 00 -Submittal Procedures for Submittals. <br />B. Manufacturer's Product Data Sheets for all materials specified certifying material complies <br />Indian River County West WWTP <br />Roof Replacement 06 10 00-1 Rough Carpentry <br />