numbers, and similar identification where applicable. <br />4. Identify and date each Record Drawing; include the designation "PROJECT <br />RECORD DRAWING" in a prominent location. Organize into manageable sets; <br />bind each set with durable paper cover sheets. Include identification on cover <br />sheets. <br />C. Record Specifications: Submit one copy of Project's Specifications, including addenda <br />and contract modifications. Mark copy to indicate the actual product installation where <br />installation varies from that indicated in Specifications, addenda, and contract modifica- <br />tions. <br />1. Give particular attention to information on concealed products and installations <br />that cannot be readily identified and recorded later. <br />2. Mark copy with the proprietary name and model number of products, materials, <br />and equipment furnished, including substitutions and product options selected. <br />3. Note related Change Orders and Record Drawings, where applicable. <br />D. Miscellaneous Record Submittals: Assemble miscellaneous records required by other <br />Specification Sections for miscellaneous record keeping and submittal in connection with <br />actual performance of the Work. Bind or file miscellaneous records and identify each, <br />ready for continued use and reference. The following items shall be submitted, not lim- <br />ited to: <br />1. Completed and signed Engineer's Punch List <br />2. Copy of Manufacturer's Final Inspection Report <br />3. Fastener Pull Tests <br />4. Landfill Charge Tickets <br />5. Asbestos Disposal Manifests (If Applicable) <br />6. Certificate of Occupancy (If Applicable) <br />1.05 WARRANTIES <br />A. Asphalt Shingle Roofing System warranty as outlined in Section 07 31 13. <br />B. Pre -finished Sheet Metal finish warranty as outlined in Section 07 62 00. <br />C. Contractor's five (5) year warranty on their company letterhead using sample contained <br />in the Project Manual. <br />Contractor will be required to attend two post construction field inspections: the <br />first no earlier than twenty -three (23) months and no later than twenty-four (24) <br />months after the date of Final Completion and the second no earlier than fifty- <br />nine (59) months and no later than sixty (60) months. Contractor shall complete <br />any corrective action requested by Owner, Engineer, or Manufacturer at no addi- <br />tional cost to the Owner. <br />D. Contractor's Asbestos -Free Warranty on their company letterhead using sample con- <br />tained in the Project Manual. <br />PART 2 PRODUCTS (NOT USED) <br />PART 3 EXECUTION (NOT USED) <br />END OF SECTION 0177 00 <br />Indian River County West WWTP <br />Roof Replacement 01 7700-3 Closeout Procedures <br />