My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-168A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-168A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 11:08:59 AM
Creation date
10/15/2018 3:58:30 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/11/2018
Control Number
2018-168A
Agenda Item Number
8.W.
Entity Name
Southern Coatings, Inc.
Subject
West Wastewater Treatment Plant Roof Replacement
Area
8405 8th Street
Project Number
IRC-1803
Bid Number
2018074
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
polyethylene -film -reinforced top surface laminated to SBS -modified asphalt adhesive, <br />with release paper backing; suitable for high temperature applications up to 250 degrees, <br />approved by asphalt shingle manufacturer such as: <br />1. Mid -States Asphalt Quik -Stick HT. <br />2. Grace Ice and Water Shield HT. <br />3. Carlisle WIP 300 HT. <br />4. Engineer's accepted equivalent <br />D. Ventilation Components: <br />Ridge Vent: Shingle -over design as provided by asphalt shingle manufacturer. <br />E. Miscellaneous <br />1. Underlayment Fasteners: Plastic capped nails, V in length with a V diameter <br />head. <br />2. Starter Strips: As recommended and required by asphalt shingle manufacturer to <br />meet specified warranty requirements. <br />3. Shingle Fasteners: Hot -dipped galvanized roofing nail of adequate length to <br />penetrate the deck a minimum of 3/4 inch with 1-1/2" in min length, annular <br />threaded 11 or 12 gauge with a 3/8" diameter head. <br />4. Hip and Ridge Shingle Fasteners: Hot -dipped galvanized roofing nail of adequate <br />length to penetrate the deck a minimum of 3/4 inch with 2-1/2" in min length, 11 <br />or 12 gauge with a 3/8" diameter head. <br />5. Roof Cement: Asbestos free polymer modified trowel grade asphaltic cement <br />meeting the requirements of ASTM D 4586 Type I or II. <br />6. Vent Pipe Flashings: Pre -fabricated, rigid section, high-density polypropylene or <br />other UV -stabilized material. <br />PART 3 EXECUTION <br />3.01 INSPECTION <br />3.02 <br />3.03 <br />A. Contractor shall verify that deck surfaces are dry, free of ridges, warps, or voids and that <br />work penetrating the roof deck, or which may otherwise affect the roofing has been <br />properly prepared. <br />B. Notify Engineer in writing of unsatisfactory conditions. Do not proceed with shingle work <br />until all unsatisfactory conditions have been corrected in a manner acceptable to the <br />Engineer. <br />PREPARATION <br />A. General. All surfaces shall be swept or vacuumed prior to commencement of roofing. <br />APPLICATION <br />A. Self -Adhering Underlayment <br />1. Install per Manufacturer's recommendations except as noted herein. <br />2. End laps to be a minimum of 4", and side laps a minimum of 2". <br />3. Completely cover deck surface with one ply of underlayment by laying <br />underlayment parallel to eaves. <br />Indian River County West WWTP <br />Roof Replacement 0731 13-3 Asphalt Shingle Roofing <br />
The URL can be used to link to this page
Your browser does not support the video tag.