Laserfiche WebLink
3.04 <br />two nails approximately 1 inch from upslope edge of horizontal flange. Dab roof <br />cement at each fastener. <br />6. Install shingle course over step flashing, butt shingle that intersects the wall firmly <br />against step flashing and secure in place. Do not provide shingle fastener through <br />step flashing. <br />7. Seal edge of shingle over step flashing with quarter sized dab of roof cement. <br />G. Daily Tie-ins: Contractor to take adequate provisions on tie-ins between new roofing and <br />. existing. Contractor is responsible for all interior damages associated with his operations. <br />PROTECTION <br />A. Lay out progression of work to minimize working on or above completed roofing. <br />B. Minimize traffic over finished roof surface. <br />END OF SECTION 07 3113 <br />Indian River County West WWTP <br />Roof Replacement 0731 13-5 Asphalt Shingle Roofing <br />