Laserfiche WebLink
Bid No. 2018074/IRC-1803 <br />AGREEMENT <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the State of Florida <br />organized and existing under the Laws of the State of Florida, (hereinafter called OWNER) <br />and Southern Coatings, Inc. <br />(hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the mutual covenants <br />hereinafter set forth, agree as follows: <br />ARTICLE 1- WORK <br />CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is generally <br />described as follows: <br />PROJECT DESCRIPTION: Project consists the replacement of the Control Room roof at the Indian River <br />County West Wastewater Treatment Plant located at 8405 8`h Street, Vero Beach, Florida, 32968. Work includes <br />the removal and disposal of the following: existing shingles, underlayment, sheet metal flashings, trim, gutters, <br />downspouts, and gutter edge wood facia boards. Repair of existing substrate as needed and installation of the <br />following: underlayment, shingles, sheet metal flashings, trim, gutters, downspouts and gutter edge wood facia <br />boards. <br />ARTICLE 2 - THE PROJECT <br />The Project for which the Work under the Contract Documents may be the whole or only a part is generally <br />described as follows: <br />Project Name: INDIAN RIVER COUNTY WEST WWTP ROOF REPLACEMENT (IRC -1803) <br />Bid Number: 2018074 <br />Project Address: 8405 eHSTREET, VERO BEACH, FLORIDA32968 <br />ARTICLE 3 - CONTRACT TIMES <br />3.1 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment <br />as stated in the specifications are of the essence of theAgreement. <br />3.2 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be substantially completed on or before the 30"calendar day after the date when the Contract <br />Times commence to run as provided in the Notice to Proceed and completed and ready for final payment in <br />accordance with the Notice to Proceed on or before the 45"calendar day after the date when the Contract <br />Times commence to run. <br />Page 24 of 34 <br />