Laserfiche WebLink
Bid Number 2018024 <br />Addendum No.1, <br />Page 2 of 2 <br />6. Irrigation is listed as an Allowance, is that correct? Or will it need to be a firm lump sum number? The total <br />cost of Irrigation is included in item 580-1-1G. <br />7. Is the electric and meter to irrigation pump by others? If not, we will need more details for electrical, hook <br />up. Service pole and meter shall be installed by City of Vero Beach Electric. Contractor shall coordinate <br />with the City of Vero Beach Electric. Electrical installation cost from meter to pump shall be the <br />responsibility of contractor payable under line item 580-1-1G. <br />8. The Geotextile Fabric line item, I don't see on plan or any detail/spec. Can you please clarify location and <br />spec? Geotextile fabric (silt fence) is provided on civil sheet C6. The material location for installation is <br />provided on civil sheet C5. <br />9. Is there an estimate for this project? It would speedup bid bonding and bonding process. Quantity estimates <br />have been updated with the bid form. No other estimate is provided for this bid. <br />Attachments: <br />REVISED Atlantic Boulevard Parking Area Plans <br />REVISED Bid Form <br />*************This Addendum must be acknowledged with submittal package and/or by return of this <br />Acknowledgement with your submittal package ************ <br />Company Name Timothy Rose Contracti <br />Name: Timothy Rose Title: President <br />(Type / Printed) <br />Authorized Signature: Date: 08.08.18 <br />Telephone: 772.564.7800 Email: TimRose7@comcast.net <br />