Laserfiche WebLink
6. Local Sponsor Contact Title: <br />7. Mailing Address: <br />8. Phone Number: <br />9. Email Address: <br />10. Additional Contact Information (Optional): <br />HURRICANE IRMA IMPACTS <br />Please review the report at the link below and answer the following questions. Please attach a post - <br />storm engineering report with supporting information, if available. <br />Hurricane Irma Post -Storm Beach Conditions and Coastal Impact in Florida: <br />https://floridadep.gov/sites/default/files/H IRMA Post -Storm Report.pdf <br />11. Using the information from the report, fill in the information that corresponds best with the <br />proposed project area of this request: <br />County: <br />Locations Reference Monuments Erosion Condition <br />Please attach separate sheet if additional space is needed. <br />SCOPE OF WORK <br />12. A scope of work must be submitted with this request. The scope of work must include a detailed <br />description of the work to be conducted, a schedule or timeline for the completion of work, and the <br />estimated costs for each task. Based on the information in the scope, fill in the following table: <br />Question <br />Response <br />Has the work started? (Yes or No) <br />What date did work start? (month/day/year) <br />93 <br />