Laserfiche WebLink
Summary: Change Order #2 <br />2018-047 US 1 ARV Replacement <br />Indian River County Utilities <br />Date: September 28, 2018 <br />Labor Cost <br />Bid Item <br />No. <br />Bid Item Description <br />Estimated <br />Quantity <br />Unit of <br />Measure <br />Unit <br />Price <br />Total Item <br />Price <br />Change Order 2 <br />CO2 -1 <br />Add: Remove and Replace Existing Drainage Structure <br />(Mitered Pipe End), Form and Pour 5 ea Valve Pads (see <br />Johnson Davis Proposal) <br />1 <br />EA <br />$1,000.00 <br />$1,000.00 <br />CO2 -2 <br />Delete: Force Account <br />(1) <br />LS <br />$15,000.00 <br />-$15,000.00 <br />Total Change Order <br />-$14,000.00 <br />