My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-193
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-193
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 1:06:42 PM
Creation date
10/29/2018 2:52:15 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/23/2018
Control Number
2018-193
Agenda Item Number
8.C.
Entity Name
G.K. Environmental
Subject
Work Order No.2 Shallow Marsh #2 Landscaping Services
Area
Osprey Acres Floway nad Nature Preserve
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tan 4,715 SF - S. patens / BR 2" plugs / 18" OC = 1,475 <br />1.45 <br />1,475 <br />$2,138.75 <br />Dr Green 6,747 SF - S. patens / BR 2" plugs / 18" OC = 2,108 <br />1.45 <br />2,108 <br />$ 3,056.60 <br />Dr Brown 5,329 SF - 1 Gal muhly, S. bakeri, & wild coffee / 5' OC = 215 <br />3.75 <br />215 <br />$ 806.25 <br />subtotal <br />$12,330.10 <br />D) EEI Grass Areas <br />EEL Grass or white lilies (availability) = 825 <br />$ arh <br />$total <br />3 Refugium / 2,640 SF / BR 2" plugs / 18" OC / 3' <br />2.75 <br />825 25 <br />$ 2,268.75 <br />band around top of slop perimeter only <br />(880 lineal ft x 3 = 2,640 SF) <br />5 plant areas - 1,500 SF, BR / 2' plugs / 18' OC <br />subtotal <br />$ 2,268.75 <br />E) 4.$ _/ Area From Perimeter Berm to Silt Fenc - <br />$ <br />3.0 ac of S bakers / 1 Gal on 5'0C = 5,226 plants <br />(1,742 per acre = 3 ac x 1,742 = 5,226 plants) <br />arh <br />3.75 <br />5,226 <br />$19,597.50 <br />1.8 ac muhly grass / 1 Gal on 5'0C = 3,136 plants <br />(1,742 per acre = 1.8 ac x 1,741 = 3,136) <br />3.75 <br />3,136 <br />$11,760.00 <br />subtotal <br />$ 31,357.50 <br />F) <br />EEL Grass - 3 ft. OC J # <br />2.75 2,977 $8,186.75 <br />subtotal <br />$ 8,186.75 <br />TOTAL FOR PHASE III (A, B, C, D) E, & F) <br />$83,366.85 <br />
The URL can be used to link to this page
Your browser does not support the video tag.