My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-193
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-193
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 1:06:42 PM
Creation date
10/29/2018 2:52:15 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/23/2018
Control Number
2018-193
Agenda Item Number
8.C.
Entity Name
G.K. Environmental
Subject
Work Order No.2 Shallow Marsh #2 Landscaping Services
Area
Osprey Acres Floway nad Nature Preserve
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A E <br />A) Mainten: <br />8.3 acres: <br />open water areas, islands, berms, & open upland areas 1,400.00 12 events $16,800.00 <br />1 event per month / 9 months except 2 events per <br />month in June, July, August = 12 events (based on starting in December 2018) <br />TOTAL FOR PHASE IV <br />$16,800.00 <br />GRAND TOTAL GKE COST FOR PROJECT / PHASES I, II, III, AND IV... <br />(includes installation, fertilization, initial watering, warranty, and 9 months maintenance) & as.noted bel$125, 19.12 <br />1 <br />NOTE 11: <br />All plants will be watered in, fertilized, and warranted for 85% survival for the 9 month maintenance period. It is not anticipated that <br />additional watering will be necessary based on the time of year that planting will be completed (ie: November / December 2018) and the <br />type of plants being planted. <br />NOTE 2: TOTAL SITE PLANTING AREAS 298 317 SE / 6 85 acreE <br />This includes the proposed square footage of eel grass planted. There is an additional 1.8 acres of open water that will not beplanted, <br />but will need to be maintained for cattails, etc. <br />NOTE 3: TOTAL SIT MAINT MANCE AREAS ! 3 53 24R SF / g arrPc <br />NOTE 4: <br />The above pricing is based on the site being ready / prepped (by others) to plant. <br />ND -U-1. <br />We will need a minimum of 7-8 weeks advance notice prior to planting in order to grow the appropriate number of plants. Growing <br />plants in our own nursery helps with cost reduction, quality of plant material, and survival ability. <br />NOTE 6: <br />Pricing is based on all planting going in at the same time and the above note. <br />END OF PROPOSAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.