Laserfiche WebLink
A E <br />A) Mainten: <br />8.3 acres: <br />open water areas, islands, berms, & open upland areas 1,400.00 12 events $16,800.00 <br />1 event per month / 9 months except 2 events per <br />month in June, July, August = 12 events (based on starting in December 2018) <br />TOTAL FOR PHASE IV <br />$16,800.00 <br />GRAND TOTAL GKE COST FOR PROJECT / PHASES I, II, III, AND IV... <br />(includes installation, fertilization, initial watering, warranty, and 9 months maintenance) & as.noted bel$125, 19.12 <br />1 <br />NOTE 11: <br />All plants will be watered in, fertilized, and warranted for 85% survival for the 9 month maintenance period. It is not anticipated that <br />additional watering will be necessary based on the time of year that planting will be completed (ie: November / December 2018) and the <br />type of plants being planted. <br />NOTE 2: TOTAL SITE PLANTING AREAS 298 317 SE / 6 85 acreE <br />This includes the proposed square footage of eel grass planted. There is an additional 1.8 acres of open water that will not beplanted, <br />but will need to be maintained for cattails, etc. <br />NOTE 3: TOTAL SIT MAINT MANCE AREAS ! 3 53 24R SF / g arrPc <br />NOTE 4: <br />The above pricing is based on the site being ready / prepped (by others) to plant. <br />ND -U-1. <br />We will need a minimum of 7-8 weeks advance notice prior to planting in order to grow the appropriate number of plants. Growing <br />plants in our own nursery helps with cost reduction, quality of plant material, and survival ability. <br />NOTE 6: <br />Pricing is based on all planting going in at the same time and the above note. <br />END OF PROPOSAL <br />