Laserfiche WebLink
Geosym'teccl <br />6770 South; Washington Avenue, Suite 3 <br />Titusville, Florida 32780 <br />' , ] <br />cons llltants <br />PH 321.269.8550 <br />www.geosyntec.com <br />18 October 2018 <br />Mr. Himanshu H.: Mehta, P.E. <br />Managing Director <br />Solid Waste Disposal District <br />Indian River County <br />1325 101 Avenue SW. <br />Vero Beach, Florida 32968 <br />Subject: Proposal to Provide Consulting Services Associated with Phase l of the Gifford Road <br />Landfill Redevelopment Plan <br />Former South Gifford Road Landfill, Vero Beach, Indian River County, Florida <br />Dear Mr. Mehta: <br />Geosyntec Consultants (Geosyntec) is pleased to submit this :letter proposal to the Indian :River County (IRC) <br />Solid Waste Disposal District (SWDD) to. provide consulting services associated: with Phase 1 of the <br />Redevelopment: Plan for the Former Gifford Road Landfill, located in Vero Beach, Indian River County, Florida <br />(Site). As you are aware, the conceptual design for the Redevelopment Plan for the Former South Gifford Road:. <br />Landfill, including Phase. 1, was prepared as:part of the recent brownfields grant -related planning activities <br />conducted by the Treasure Coast Regional Planning Committee (TCRPC). Based on the conceptual plan, Phase 1 <br />consists of surficial land clearing of approximately 8 -acres of land (including 3 -acres at the north end of the Site <br />.that will serve as the Site frontage, and .5 -acres in the central portion of the Site that will serve as an open field), <br />landscaping along the 41St Street. frontage, and installation of an associated. irrigation system. The first step in <br />implementing Phase 1 is to finalize the landscaping design and create formal bid specifications for land clearing <br />and landscaping. Clearing of the 8 acres, :installation of irrigation system and installation of landscaping will be <br />completed. subsequently .to the scope of work included herein.. The remainder of . this proposal: provides an <br />overview of the project background, a description of the proposed scope of work, a budget estimate,. and a <br />discussion. of the schedule forkeomplishment of the work described herein. <br />PROJECT BACKGROUND <br />The Former South Gifford Road Landfill is an approximately 115 -acre closed landfill, of which the northern 55 - <br />acres: are owned by IRC and the southern portion is owned by the. City of Vero Beach. The Indian. River. County <br />Board of County Commissioners (BCC) supported the submittal of: an application by TCRPC for a.United States <br />Environmental Protection Agency (USEPA) Brownfields Coalition Assessment Grant to facilitate additional work <br />on this Site. TCRPC was awarded the Brownfields Coalition Assessment Grant in May 2015. Since May 2015, <br />Geosyntec, TCRPC, and IRC worked with the Gifford community on a conceptual design for the redevelopment <br />of the. Former Gifford Road -Landfill. The conceptual design was broken down into six separate phases, including. <br />the Phase 1 land. clearing and landscaping work described earlier. The BCC recently requested that the SWDD <br />move forward and obtain a cost proposal (from Geosyntec) to implement Phase 1. <br />FR0766\XR18011 Phase 1 Gifford rev <br />engineers I scientists I innovators. <br />