Laserfiche WebLink
Mr. Himanshu Mehta; P.E. GeosynteC D <br />.18 October 2018 consultants <br />Page 2: <br />PROPOSED: SCOPE OF WORK <br />This proposed scope of work has been divided into the following tasks, which are described in more detail below: <br />(i) Task 1 - Project Management; (ii) Task 2 - Finalize Landscaping Conceptual Design; and (iii) Task 3 — Bid <br />Specification Packages. The remainder of this section presents a general description of the activities to be <br />...performed as part of each task. <br />Task 1— Proiect Management <br />Under this task, Geosyntec will perform project planning and management responsibilities, :such as <br />correspondence with IRC :and Schmidt Nichols., invoice review; project coordination, and project administration. <br />The budget includes ten hours for the project manager, three hours for the principal -in -charge, .and four hours for <br />the administrative assistant. . . <br />Task 2 — Finalize LandscaniM Conceptual Design <br />As you are aware, the redevelopment plan for the Former South Gifford Road Landfill is a conceptual design; <br />therefore, we propose to enlist the assistance of.a local landscape architect to finalize the.landscaping design along <br />41s' Street. This effort is specific to Phase 1 and is not intended to address the redevelopment plan for the other <br />phases. at this time.: Under this task, Geosyntec. will work with our subcontractor, Schmidt Nichols Landscape <br />Architecture and Urban Planning (Schmidt Nichols) to finalize the conceptual design for the landscaping along <br />41St Street. The estimated budget for this task includes finalizing the design, including irrigation design and <br />completion of sealed plans by a landscape architect,: and providing IRC with an estimate of probable.cost for the <br />remainder of Phase 1 of the Gifford redevelopment construction prior to working on Task 3 (below). <br />Task 3 — Bid Specification Packages <br />Under this task, we wilt prepare a draft bid specification packages for landscaping and clearing, review <br />landscaping and land clearing bids received from potential contractors, and recommend contractors for each scope <br />of work. The specifications will incorporate health and safety requirements, as well as contractual and insurance. <br />requirements. . The bid solicitation language will include contact information, deadlines, proposal content <br />requirements, and evaluation criteria. Geosyntec will provide proposal requirements and a specific:format for the <br />contractors to follow to aid in the receipt of consistent contractor proposals. The bid schedule will be structured <br />in a manner to help optimize pricing from the potential contractors and minimize their issuance of change orders. <br />Geosyntec will prepare one draft of the bid: specification packages for IBC's review and comment. We have <br />assumed four hours of Professional consulting time to respond to IBC's comments on the draft bid packages and <br />develop final packages. <br />The final bid specification packages will be issued to at least three candidate contractors for each scope of work <br />(landscaping andland clearing). Geosyntec will help IRC review and rank received bids. This proposal does not <br />include execution of the land clearing of the 8 -acres or landscaping activities in the 3 -acre area of the Site along <br />41s' Street. .. . <br />XR18011 Phase 1 Gifford rev <br />engineers I scientists I innovators <br />