My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/02/2018 (2)
CBCC
>
Meetings
>
2010's
>
2018
>
10/02/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2021 12:42:57 PM
Creation date
11/26/2018 4:03:26 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/02/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
564
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kimley»>Horn <br />Activities, and the FDEP Generic Permit for Stormwater Discharges from Construction <br />Activities. <br />D. Jurisdictional Permitting: <br />The Consultant shall prepare permit applications for the Indian River Farms Water Control District <br />(IRFWCD), St Johns River Water Management District (SJRWMD), Army Corp of Consultants <br />(ACOE) and Indian River County for submittal by the Client. This will consist of all required <br />evaluation, design, coordination, and follow-up work necessary to support permit applications. <br />The Consultant shall assemble and be responsible for the final submittal. <br />The Consultant shall prepare permit sketches for submission to IRC, IRFWCD, ACOE and SJRWMD <br />for dredge and fill activities, if necessary. The Consultant shall submit all permit sketches on 8.5" <br />x 11" sheets. Sketches shall be neatly scaled, signed and sealed, and reproducible. <br />1. Environmental Resource Permitting/Section 404 Permitting <br />The Consultant will prepare and submit the joint Environmental Resource Permit (ERP) <br />application package to the SJRWMD and the ACOS. The application includes the ERP standard <br />forms and a compilation of supplemental materials such as permit sketches, Vegetation <br />(FLUCFCS), soils, quadrangle and FEMA -FIRM maps. <br />The Consultant will coordinate on the behalf of the Client with each agency identified in this <br />task. This may include up to one (1) meeting with the agencies to discuss requests for <br />additional information (RAI), and written responses to one (1) request for additional <br />information (RAI) including plan modifications. This scope assumes that mitigation measures <br />will not be necessary or required. This scope assumes that coordination with US Fish and <br />Wildlife Service through the preparation of Biological Assessments or Biological Opinions will <br />not be required. <br />Permit application submittals will be made subsequent to the 60% plan set submittal approval <br />by the Client. <br />E. Signing and Pavement Marking Plans: <br />Signing and Pavement Marking plans shall include: Preparation of the plan layout, quantities <br />(including signing and pavement marking quantity) and tabulation of quantities. All plans are to <br />be prepared in accordance with the latest design standards and practices (MUTCD), FDOT <br />Standard Specifications, Indexes, and shall be accurate, legible, complete in design and drawn at <br />the same scale as the Roadway Plans, furnished in reproducible form. Plans will be included with <br />7 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.