My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/02/2018 (2)
CBCC
>
Meetings
>
2010's
>
2018
>
10/02/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2021 12:42:57 PM
Creation date
11/26/2018 4:03:26 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/02/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
564
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kimley»>Horn <br />the roadway plans and submitted as indicated above. <br />F. Utility Coordination: <br />The Consultant will coordinate with franchise utility operators in the vicinity of the project such <br />that the proposed construction activities can be developed to minimize impacts to existing utilities <br />located within the project limits. It is anticipated that the 581h Avenue alignment will be developed <br />as to not require relocation of the existing FP&L transmission facilities located along the west side <br />of 58th Avenue. Any utility permitting and relocation design required to accommodate the <br />proposed improvements will be addressed as an additional service relative to this scope of work. <br />G. Signalization Plans: <br />Mast -arm traffic signals will be designed at the following intersection: <br />• 57th Street and 58th Avenue (full signal design) <br />The signalization improvements will be designed to meet current County and FDOT standards. <br />Luminaries will be provided on each mast arm pole. The pole analysis and design of the signal <br />systems will be completed and submitted to County for review. Signalization plans will be <br />included with the roadway plans and submitted as indicated above. <br />SCHEDULE <br />Upon authorization to proceed by the Client, final design documents are expected to take <br />approximately twelve (15) months from the Notice to Proceed (NTP). <br />NTP <br />Phase I Submittal (30% Design Plans) <br />Phase II Submittal (60% Design Plans) <br />Phase III Submittal (90% Design Plans) <br />Phase IV Submittal (Final Design Plans) <br />Client Execution Ili <br />3 months following NTP <br />6 months following NTP <br />9 months following NTP <br />12 months following NTP <br />Footnote: <br />(1) And receipt of Design Survey and Geotechnical Investigation <br />e8of10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.