Laserfiche WebLink
PHASE IV <br />A) Maintenance for All Areas $each #units $total <br />8.3 acres: open water areas, islands, berms, & open upland areas 1,400.00 12 events $16,800.00 <br />1 event per month / 9 months except 2 events per <br />month in June, July, August = 12. events (based on starting in December 2018) <br />TOTAL FOR PHASE IV $16,800.00 <br />GRAND TOTAL GKE COST FOR PROJECT / PHASES 1, II, III, AND IV..................'...,.................................................. $125,119.12 <br />(includes installation, fertilization, initial watering, warranty, and 9 months maintenance) & as noted below. <br />NOTE 1: <br />All plants will be watered in, fertilized, and warranted for 85% survival for the 9 month maintenance period. Itis not anticipated that <br />additional watering will be necessary based on the time of year that planting will be completed (ie: November / December 2018) and the <br />type of plants being planted. <br />NOTE 2: TOTAL SITE PLANTING AREAS - 298,312 SF / 6.85 acres <br />This includes the proposed square footage of eel grass planted. There is an additional 1.8 acres of open water that will not be planted, <br />but will need to be maintained for cattails, etc, <br />NOTE 3: TOTAL SITE MAINTENANCE AREAS / 353,248 SF / 8.3 acres <br />NO3:"- <br />The <br />NO3: 4:The above pricing is based on the site being ready / prepped..(by others) to plant. <br />OTE <br />We will need a minimum of 7-8 weeks advance notice prior to planting in order to grow the appropriate number of plants. Growing <br />plants in our own nursery helps with cost reduction, quality of plant material, and survival ability. <br />NOTE 6: <br />Pricing is based on all planting going in at the same time and the above note. <br />END OF PROPOSAL <br />76 <br />