Laserfiche WebLink
Ardaman & Associates, Inc. 460 NW Concourse Place, Unit 1 <br />Geotechnical, Environmental and Port St. Lucie, Florida 34986772-878-0072 (office) <br />Materials Consultants 772-878-0097 fax <br />www.ardaman.com <br />EXHIBIT "1" <br />ARDAMAN & ASSOCIATES, INC. <br />FEE SCHEDULE <br />INDIAN RIVER COUNTY <br />GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING <br />AND CONSTRUCTION MATERIALS TESTING SERVICES <br />(Effective 2018 - 2021) <br />DRILL RIG MOBILIZATION AND DEMOBILIZATION <br />Menand Equipment........................................................................................................................................$350.00/trip <br />Portable Barge............................................................................................................................. $5,500.00 Minimum/trip <br />STANDARD DRILLING <br />AugerBorings (4-inch)..................................................................................................... <br />Wash Borings - Cuttings Only (up to 3 inch) Soil drilling ................................................... <br />Rockdrilling.................................................................................................................. <br />Standard Penetration Test (SPT) Borings <br />(ASTM D-1586) in soil (N -values <50): <br />from surface to 25 feet.................................................................................................. <br />from25 feet to 50 feet................................................................................................... <br />from50 feet to 100 feet................................................................................................. <br />from 100 feet to 125 feet............................................................................................... <br />from125 feet to 150 feet............................................................................................... <br />Standard Penetration Test (SPT) Borings in <br />high resistance soil/rock (N -values >50, in addition to SPT drilling rate) ....................... <br />Furnish; Install, and Remove Casing (up to 4 -inch): <br />from surface to 50 feet.................................................................................................. <br />from50 feet to 100 feet................................................................................................. <br />from100 feet to 150 feet............................................................................................... <br />Drilling (Time Basis)/2 man-crew...................................................................................... <br />Drilling (Time Basis)/3 man-crew...................................................................................... <br />Support Water Truck (Time Basis)................................................................................... <br />Rock Coring (N or H size) <br />from surface to 50 feet.................................................................................................. <br />from50 feet to 100 feet................................................................................................. <br />from 100 feet to 150 feet............................................................................................... <br />FieldPermeability............................................................................................................. <br />Double Ring Infiltrometer Test (ASTM D-3385-75)........................................................... <br />DRILL RIG SAMPLING <br />Additional SPT Sampling: <br />from10 feet to 25 feet.................................................................................... <br />from26 feet to 50 feet.................................................................................... <br />from 51 feet to 100 feet.................................................................................. <br />from 101 feet to 125 feet................................................................................ <br />from 126 feet to 150 feet................................................................................ <br />Undisturbed Samples: <br />ShelbyTube.................................................................................................. <br />Fixed -Piston Shelby, Osterberg, Pitcher........................................................ <br />DRILL RIG SOUNDINGS <br />Piezocone Soundings........................................................ <br />Muck Probing/Clay Sampling ............................................ <br />Cone/Piezoprobe Soundings (Time Basis) ........................ <br />Piezoprobe Dissipation Monitoring .................................... <br />................................... $10.00/f cot <br />..................................... $9.00/f cot <br />................................... $15.00/foot <br />...................................$14.50/foot <br />................................... $15.5 0/foot <br />................................... $16.5 0/foot <br />...................................$20.00/foot <br />...................................$25.00/foot <br />.....................................$5.50/foot <br />................................. $10.50/hour <br />................................. $12.50/hour <br />...................................$15.50/foot <br />............................... $250.00/hour <br />............................... $350.00/hour <br />................................. $250.00/day <br />...................................$30.00/foot <br />...................................$35.00/foot <br />...................................$40.00/foot <br />................................. $350.00/test <br />................................. $500.00/test <br />.................................... $23.00/sample <br />.................................... $26.00/sample <br />.................................... $29.00/sample <br />.................................... $34.00/sample <br />.................................... $39.00/sample <br />.................................. $225.00/sample <br />.................................. $350.00/sample <br />......................................................................... $13.50/foot <br />.................................................................. hourly tech rate <br />..................................................................... $250.00/hour <br />..................................................................... $250.00/hour <br />460 NW Concourse Place, Unit 1 Port St. Lucie, Florida 34986 772-878-0072 (office) 772-878-0097 (fax) Page 3 of 5 <br />