My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-265
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-265
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 2:53:22 PM
Creation date
12/7/2018 12:23:40 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
12/04/2018
Control Number
2018-265
Agenda Item Number
8.I. (3 of 7)
Entity Name
Ardaman & Associates
Subject
Geotechnical Engineering Services
Bid Number
RFQ 2018042 IRC-1812
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Ardaman & Associates, Inc. <br />Geotechnical, Environmental and <br />Materials Consultants <br />EXHIBIT "1" <br />ARDAMAN & ASSOCIATES, INC. <br />FEE SCHEDULE <br />INDIAN RIVER COUNTY <br />460 NW Concourse Place, Unit 1 <br />Port St. Lucie, Florida 34986 <br />772-878-0072 (office) <br />772-878-0097 (fax) <br />www.ardaman.com <br />GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING <br />AND CONSTRUCTION MATERIALS TESTING SERVICES <br />(Effective 2018 - 2021) <br />SPECIAL DRILLING/SOUNDING <br />Prices for special drilling (barge drilling; air boat sampling; amphibious drilling; NQ wire line coring; large diameter borings; <br />drilling in corrosive, contaminated or hazardous materials; drilling at great depths; installing large diameter temporary <br />casing; etc.) field vane testing, and other specialized sampling or field tests will be determined per project. <br />OTHER DRILL RIG CHARGES <br />Clearing Difficult Access, Hole Location and Set-Up....................................................................................... $250.00/hour <br />StandbyTime (drillers).................................................................................................................................... $250.00/hour <br />Piezometer and Well Installation (plus materials)............................................................................................ $250.00/hour <br />Bore Hole Grouting and Sealing (plus materials)............................................................................................. $250.00/hour <br />Materials............................................................................................................................................................. Cost + 15% <br />BargeBorings....................................................................................................................... Normal drilling rates times 1.5 <br />ATVBorings.......................................................................................................................... Normal drilling rates times 1.5 <br />INSTRUMENTATION <br />Prices for installation of monitor wells, inclinometers and settlement devices and prices for performing field permeability and <br />packer tests will be determined per project. <br />GENERAL FIELD EQUIPMENT: <br />Generator................................................................................ <br />SteamCleaner......................................................................... <br />Surveying Equipment (Water Table Elevations) ...................... <br />Peristaltic Purging Pump ......................................................... <br />pH/Conductivity Meter............................................................. <br />TurbidityMeter......................................................................... <br />Water Level Indicator............................................................... <br />EXPENDABLE SUPPLIES: <br />High Capacity (0.45 micron) Filter ........................ <br />Disposable Teflon Bailer ....................................... <br />Disposable Polyethylene Bailer ............................ <br />Isopropyl Alcohol (decontamination) ..................... <br />Deionized Water (decontamination) ...................... <br />16 oz. Soil Jars (soil headspace analysis) ............ <br />TygonTubing ....................................................... <br />Polyethylene Tubing ............................................. <br />55 -gallon Drum ..................................................... <br />HEAVY EQUIPMENT: <br />......................................................................... $100.00/day <br />......................................................................... $100.00/day <br />........................................................................... $65.00/day <br />........................................................................... $50.00/day <br />........................................................................... $35.00/day <br />........................................................................... $55.00/day <br />........................................................................... $25.00/day <br />........................................................................................ $25.00/each <br />........................................................................................ $20.00/each <br />........................................................................................ $15.00/each <br />...................................................................................... $15.00/gallon <br />........................................................................................ $5.00/gallon <br />.......................................................................................... $15.00/box <br />............................................................................................ $3.50/foot <br />............................................................................................. $.85/foot <br />......:................................................................................ $75.00/drum <br />Vacuum Truck, Dump Truck, Crane, Excavator, Trackhoe, Backhoe, etc........................................................... Cost + 15% <br />ENVIRONMENTAL SITE ASSESSMENTS <br />Phase I Environmental Site Assessments <br />Tracts 50 acres or less (contiguous properties or per individual tract) ................................................... $2,000.00 Minimum <br />Tracts between 51 and 500 acres (contiguous properties).................................................................... $2,300.00 Minimum <br />Tracts greater than 500 acres..................................................................................................................... varies by project <br />Phase II Environmental Site Assessments................................................................................................. varies by project <br />Analytical Laboratory testing for hazardous or petroleum contamination <br />(soil, sediment and groundwater).........................................................................................................................cost + 15% <br />460 NW Concourse Place, Unit 1 Port St. Lucie, Florida 34986 772-878-0072 (office) 772-878-0097 (fax) Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.