Laserfiche WebLink
November 15,2018 <br /> Page 6 of 7 <br /> Schedule <br /> Stantec will coordinate closely with Indian River County to develop a final deliverable <br /> schedule as the project proceeds, but the proposed overall schedule is shown below: <br /> • Notice to Proceed Jan 2019 <br /> • Conditions Analysis Jan 2019 to Sept 2019 <br /> • Draft BPP Report Sept 2019 <br /> • Comment Period Sept 2019 to Oct 2019 <br /> • Final BPP Report Nov 2019 <br /> ASSUMPTIONS: <br /> Our estimated costs for this Project include the following assumptions: <br /> • This effort does not include design or engineering plan development for the <br /> proposed management strategies. The purpose of this effort is to provide <br /> recommendations based on the evaluation described in the scope of work. <br /> • Existing data will be provided by the County to Stantec in a timely manner. The <br /> following is a list of the data needs that are anticipated within the timeframes of this <br /> scope but may not be all-inclusive.Stantec will work with the County to transfer data <br /> and identify data needs whether through the County's database or through existing <br /> consultants. <br /> > Survey Data - reports, historic beach profiles, topography, bathymetry, GIS <br /> data <br /> D Environmental Data - monitoring reports, hardbottom locations, sea turtle <br /> nesting and shorebird data <br /> > Geotechnical Data - design documents, beach fill characteristics, dune <br /> replenishment events, beach restoration activities, placement locations and <br /> quantities <br /> > Cost Data - reports, previous project costs (i.e. beach restoration activities, <br /> design services, construction, construction administration, monitoring, etc.), <br /> emergency costs for post-storm recovery, data collection, cost estimates <br /> from others for project implementation <br /> • The County is performing an updated offshore sand resources multibeam survey of <br /> the south borrow area and an upland sand resources inventory in 2019. This <br /> information will be made available to Stantec upon completion. <br />