Laserfiche WebLink
November 15,2018 <br /> Page7of7 <br /> • It is assumed that all base information, design documents, engineering calculations <br /> and previous as-builts for beach projects will be provided to Stantec by the County. <br /> • Relevant information/data/documentation will be provided to Stantec by the <br /> County in a timely manner. <br /> • Any delays in delivery of the data collected by others will result in adjustments to the <br /> overall schedule without penalty to Stantec. <br /> • This scope does not include any field data collection. All data used will be from <br /> existing information/sources. <br /> • No permitting is included in this scope of work. <br /> • No economic assessment/study or cost/benefit analysis calculations are included. <br /> Only a planning level cost estimate will be provided. <br /> • This scope of work does not include costs to prepare additional documentation, <br /> respond to or modify the work product based on legal challenges or third-party <br /> peer review requests. It is assumed any costs associated with this type of request <br /> will be paid for under a separate scope of work. <br /> • Only items listed in the scope are included in the associated fee schedule. <br /> • Additional services will be provided under a separate scope and fee schedule. <br /> We thank you for the opportunity to provide professional services for this project and look <br /> forward to working with Indian River County. We are prepared to begin work on this <br /> assignment as soon as you direct us to proceed. <br /> Regards, <br /> / //7,,,/, -) <br /> / <br /> t , 2 ,..„/ <br /> Jeffry R .Tabar, PE, D.CE Matthew S.Starr, PG <br /> Prini p I Associate <br /> US Coastal Lead/Senior Coastal Engineer SE Coastal Team Leader <br /> Phone: (410) 443-2061 Phone: (239) 315-6208 <br /> Jeff.Tabar@stantec.com Matthew.Starr@stantec.com <br />