My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-280
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-280
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 3:06:48 PM
Creation date
12/13/2018 4:27:45 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
12/11/2018
Control Number
2018-280
Agenda Item Number
13B
Entity Name
Florida Power & Light
City of Vero Beach
School Board of Indian River County
Indian River County
Subject
Fiber Optics Agreement - Linear Facilities Pole Attachment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ian•]IL7_\Z•l9►1=1t ll IEel: III iWelul7_1►l'1 <br />in <br />Title: <br />Ill. GENERAL CONDITIONS <br />Poles this Permit <br />New Total Poles <br />Corresponding Permits <br />A TRUE COPY <br />CERTIFICATION ON LAST PAGE <br />J.R. SMITH, CLERK <br />1. A "Make -Ready Work" permit will automatically expire if Attachments are not made and completed within 60 days after notification in <br />writing to Licensee by FPL that Make -Ready Work has been completed. <br />2. A "Non Make -Ready" permit will automatically expire if attachments are not made and completed within 60 days after date of approval <br />and is subject to field conditions and facilities on each pole at the time attachment is made. Licensee shall be required to bear any <br />and all "Make -Ready Work" cost necessitated by previous Attachments. <br />3. If permit is granted under Section II above, this permit automatically expires, as to the affected poles 30 days after written notice to <br />Licensee that FPL intends to abandon a particular pole line. Within 30 days after such notice, Licensee shall either remove its <br />attachments from those poles or obtain all necessary permits and easements, at the discretion of FPL, arrange to purchase such <br />poles from FPL. <br />Attachment Criteria — Communication Space <br />NON JOINT USE POLE <br />(no telephone) <br />Code clearance <br />40" <br />--— —— — — —— --——————— — — — — —— <br />___3r° arty Antenna <br />1' 2nd Communication Company <br />1' 1" Communication Company <br />Fig. 1 <br />JOINT USE POLE <br />(power & telephone) <br />Code clearance <br />Fig. 2 <br />2n1 Communication Company <br />1" Communication Company <br />The 151 cable attachment will be located at a height providing minimum The 15' cable attachment will be located 1' above telephone's <br />clearance over roads, obstacles, etc. highest cable Attachment <br />All additional cable or antenna attachments will be located 1' above the The 2nd cable Attachment will be located 1' above the existing <br />highest existing communication cable, with antenna highest. The antenna Attachment will be a minimum of 1' above highest <br />The antenna attachment will be a minimum of 1' above highest cable. communication cable. Only one antenna Attachment permitted per <br />Only one antenna attachment permitted per pole. pole. <br />NOTE: No cable or antenna Attachment placed in the Communication Space will compromise the 40" NESC code clearance space. <br />NOTE: By signing this document, applicant acknowledges that FPL tags poles for replacement and that the form of the tags utilized by FPL <br />may change from time to time and that Applicant, its employees, contractors, subcontractors and agents are familiar with FPL's pole tagging <br />convention and any modifications to that convention, including the form of tag utilized, prior to performing any work or installation on or around <br />any FPL pole. <br />NOTE: Applicant also acknowledges that FPL's poles routinely have attachments that emit RF radiation. Licensee is required to familiarize <br />itself, instruct and warn their employees, agents, contractors and subcontractors who are working around these devices, prior to performing any <br />work or installation on or around any FPL pole. <br />Space Allocation <br />Ground <br />All Fi IAVWmont Agreement 116402702.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.