My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-280
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-280
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 3:06:48 PM
Creation date
12/13/2018 4:27:45 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATRUE COPY <br />CERTIFICATION ON LAST PAGE <br />J.R. SMITH, CLERK <br />1.14 "Rearrangement" means any activity or work, after the Make -Ready Work, <br />that is necessary when there is a change in the FPL Facilities or FPL service requirements or to <br />ensure that Licensee's Attachments do not adversely affect FPL's Facilities or service or that of <br />Other Users previously attached. "Rearrangement" includes but is not limited to Transfer, <br />relocation, adjustment, conversion, permanent or temporary support, protection, design or <br />redesign, abandonment, and removal or reconstruction of the System. <br />1.15 "Supply Space" means the space on the pole located above the <br />Communication Space. <br />1.16 "System" means Licensee's fiber optic system, and shall include, without <br />limitation, the cable, fibers within cables, hardware and supporting devices required by Licensee <br />to attach to FPL poles as specified in Section 2.2 and any part thereof. <br />1.17 "Transfer" means solely the work of removing a portion of the System from <br />an FPL pole and re -attaching that portion of the System to a replacement FPL pole within the <br />existing FPL pole alignment at the same time that FPL transfers or relocates FPL Facilities from <br />one FPL pole to another FPL pole. <br />1.18 "Wireline" means fiber optic cable and casing. <br />ARTICLE II <br />TERM AND RIGHT TO ATTACH <br />2.1 Term. This Agreement is for an initial term of six (6) years commencing <br />with the date first written above and ending on midnight immediately preceding the six (6) year <br />anniversary of such date. The term of this Agreement, provided Licensee is not in default under <br />the terms of this Agreement, shall be continuously self -renewing for additional, consecutive five <br />(5) year terms unless either party provides written notice to the other party no later than one <br />hundred eighty (180) days prior to the expiration of the then -effective term that it wishes to <br />terminate this Agreement for any or no cause. Individual permits issued under this Agreement <br />may automatically expire as provided in Exhibit A attached hereto. <br />2.2 Existing Attachments. FPL agrees that the Existing Attachments are <br />permitted to continue in the locations that exist on the Effective Date. <br />2.3 Permission to Attach to FPL Distribution Poles. <br />(a) Pole. Except as provided in Section 3.1(a): (i) Licensee may attach New <br />Attachments to the System only to existing or future FPL poles on which FPL Distribution <br />Facilities have been installed; and (ii) Licensee may not attach New Attachments for its <br />System to FPL poles that are used solely for transmission or street lighting purposes. <br />(b) Tension Limit. No New Attachment will be permitted which results in more <br />than 200 lbs. of unguyed tension on any given FPL Pole. <br />(c) Pole Height Limit. No New Attachment will be permitted which requires FPL <br />to install a new pole with a height of more than fifty feet (50'), and FPL will not perform <br />Make -Ready Work for the purpose of installing such a pole; provided however, Licensee <br />may apply for a permit to attach to an FPL pole, as provided in Section 2.3(a) above, <br />Confidential 3 Linear Facilities Attachment Agreement 116402702.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.