My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/16/2018 (2)
CBCC
>
Meetings
>
2010's
>
2018
>
10/16/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 11:55:12 AM
Creation date
12/14/2018 2:11:54 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/16/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change Order #02 <br />PROJECT: US 1 Air Release Valve and 24" Forcemain Replacement <br />DATE OF ISSUANCE: September 28, 2018 <br />OWNER: Indian River County Dept. of Utility Services <br />CONTRACTOR: Johnson Davis OWNER's Project No.: 2018-047 <br />You are directed to make the following changes in the Contract Documents: <br />Add remove & replace drainage structure (MES) and install valve boxes & pads. <br />Delete Force Account. <br />Reason for Change Order: <br />An existing drainage culvert's concrete mitered end section (MES) was found to conflict with <br />the temporary 12" by-pass force main route. IRC staff directed the Contractor to remove and <br />replace the MES. IRC Staff also directed Contractor to install valve boxes & concrete pads so <br />the by-pass tapping valves may be used for future connection. <br />The Force Account is being deleted for the Final Pay Request. <br />Attachments: See itemized schedule <br />CHANGE IN CONTRACT <br />PRICE: <br />Time <br />Description <br />Amount <br />Original Contract Price <br />$124,000.00 <br />Net Increase (Decrease) <br />$128,658.00 <br />from.previous Change <br />Orders No. : <br />(days) <br />Contract Price prior to this <br />$252,658.00 <br />Change Order: <br />Net increase (decrease) of <br />- $14,000.00 <br />this Change Order: <br />(days or dates) <br />Contract Price with all <br />$238,658.00 <br />approved Change Orders: <br />ACCEPTED: <br />(Signature) <br />CHANGE IN CONTRACT TIMES <br />Description <br />Time <br />Original Contract Time: <br />(days or dates) <br />Substantial Completion: <br />Final Completion: <br />Net change from previous Change <br />Orders No.: <br />(days) <br />Substantial Completion: <br />Final Completion: <br />Contract Time prior to this Change <br />Order: <br />(days or dates) <br />Substantial Completion: <br />Final Completion: <br />Net increase (decrease) this <br />Change Order: <br />(days or dates) <br />Substantial Completion: <br />Final Completion: <br />Contract Time with all approved <br />Change Orders: <br />(days or dates) <br />Substantial Completion: <br />Final Com letion' <br />---- -------------- <br />RECOMMENDED <br />ities Engineer <br />APPROVED: <br />By: <br />OWNER <br />Date: <br />FAU111illeMUTIIITY - EngineeringlProjecls - Capital Projectsk18.0125 ARV Replacement - US 1 FWConslructionlChange Orders100942 - Change Order 02.docx <br />00942 - Change Order 02.docx <br />00942-1 104 <br />
The URL can be used to link to this page
Your browser does not support the video tag.