My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/16/2018 (2)
CBCC
>
Meetings
>
2010's
>
2018
>
10/16/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 11:55:12 AM
Creation date
12/14/2018 2:11:54 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/16/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Summary: Change Order #2 <br />2018-047 US 1 ARV Replacement <br />Indian River County Utilities <br />Date: September 28, 2018 <br />105 <br />Labor Cost <br />Bid Item <br />No. <br />Bid Item Description <br />Estimated <br />Quantity <br />Unit of <br />Measure <br />Unit <br />Price <br />Total item: <br />Price <br />Change Order 2 <br />CO2 -1 <br />Add: Remove and Replace Existing Drainage Structure <br />(Mitered Pipe End), Form and Pour 5 ea Valve Pads (see <br />Johnson Davis Proposal) <br />1 <br />EA <br />$1,000.00 <br />$1,000.00 <br />CO2 -2 <br />Delete: Force Account <br />(1) <br />LS <br />$15,000.00 <br />-$15,000.00 <br />Total Change Order 2 <br />-$14,000.00 <br />105 <br />
The URL can be used to link to this page
Your browser does not support the video tag.