SECTION 01340 <br />SUBMITTAL OF SHOP DRAWINGS <br />E. All submittals shall bear the stamp of approval and signature of <br />CONTRACTOR as evidence that they have been reviewed by <br />CONTRACTOR. Submittals without this stamp of approval will not be <br />reviewed by the ENGINEER and will be returned to CONTRACTOR. <br />F. Assign a number to each submittal starting with No. 1 and thence <br />numbered consecutively. Identify resubmittals by the original submittal <br />number followed by the suffix "A" for the first resubmittal, the suffix "B" for <br />the second resubmittal, etc. <br />G. Initially submit to ENGINEER a minimum of two (2) copies of all submittals <br />that are on 11 -inch by 17 -inch or smaller sheets (no less than 8 1/2 -inch x <br />11 -inch). <br />H. After ENGINEER completes his review, Shop Drawings will be marked <br />with one of the following notations: <br />1. Approved <br />2. Approved as Noted <br />3. NOT Approved - Resubmit <br />I. If a submittal is acceptable, it will be marked "Approved" or "Approved as <br />Noted". One (1) electronic copy of the submittal will be returned to <br />CONTRACTOR. <br />J. Upon return of a submittal marked "Approved" or "Approved as Noted", <br />CONTRACTOR may order, ship or fabricate the materials included on the <br />submittal, provided it is in accordance with the corrections indicated. <br />K. If a submittal is unacceptable, one (1) copy will be returned to <br />CONTRACTOR with following notation, "NOT Approved - Resubmit". <br />L. Upon return of a submittal marked "NOT Approved - Resubmit", make the <br />corrections indicated and repeat the initial approval procedure. Upon <br />return of a submittal so marked, repeat the initial approval procedure <br />utilizing acceptable material or equipment. <br />M. Work shall not be performed nor equipment installed with an ENGINEER <br />"Approved" or "Approved as Noted" Shop Drawing. <br />N. Submit Shop Drawings well in advance of the need for the material or <br />equipment for construction and with ample allowance for the time required <br />to make delivery of material or equipment after data covering such is <br />approved. CONTRACTOR shall assume the risk for all materials or. <br />01340 - Submittal of Shop Drawings <br />01340-5 <br />F:\PublicWorks\ENGINEERING DIVISION PROJECMV46 Gifford Neighborhood.- 45th Street Beautification Project Phase 11\1-Admin\RE-bids\Bid <br />Documents\Master Contract Documents\01340 - Submittatof Shop Drawings.doc <br />