My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-253F
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-253F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 2:24:25 PM
Creation date
12/17/2018 10:53:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/13/2018
Control Number
2018-253F
Agenda Item Number
8.F.
Entity Name
Johnson-Davis, Inc.
Subject
Gifford Neighborhood 45th Street Beautification Project Phase II (2)
Area
45th Street Gifford
Project Number
IRC-1748
Bid Number
20190008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01541 <br />PROTECTION OF THE WORK AND PROPERTY <br />B. Do not store or park materials or equipment within the drip line of trees that are <br />to remain. <br />C. Install temporary fences or barricades to protect trees and plants in areas <br />subject to traffic. <br />D. Fires shall not be permitted under or adjacent to trees and plants. <br />E. Within the limits of the Work, water trees and plants that are to remain, in order <br />to maintain their health during construction operations. <br />F. Cover all exposed roots with burlap and keep it continuously wet. Cover all <br />exposed roots with earth as soon as possible. Protect root systems from <br />mechanical damage and damage by erosion, flooding, run-off or noxious <br />materials in solution. <br />G. If branches or trunks are damaged, prune branches immediately and protect the <br />cut or damaged areas with emulsified asphalt compounded specifically for <br />horticultural use. <br />H. Remove all damaged trees and plants that die or suffer permanent injury and <br />replace them with a specimen of equal or better quality. <br />I. Coordinate Work in this Section with requirements of other sections herein. <br />1_4 PROTECTION OF IRRIGATION <br />The CONTRACTOR shall be responsible for maintaining in good condition all <br />irrigation systems within the easements, which could be damaged by <br />construction activities. The CONTRACTOR shall repair any irrigation systems <br />damaged by construction activities within two (2) days. The CONTRACTOR <br />shall be responsible for maintaining the functionality of the remaining portion of <br />the system if it should fall outside of the right-of-way. <br />1.5 PROTECTION OF EXISTING STRUCTURES <br />A. Underground Structures: <br />1. Underground structures are defined to include, but not be limited to, all <br />sewer, water, gas, and other piping, and manholes, chambers, electrical <br />conduits, tunnels and other existing subsurface work located within or adja- <br />cent to the limits of the Work. <br />2. All underground structures known to ENGINEER except service <br />connections for water, sewer, electric, and telephone are shown. This <br />information is shown for the assistance of CONTRACTOR in accordance <br />01541-2...FAPublic Works\ENGINEERING DIVISION <br />PROJECTS\1748 Gifford Neighborhood -45th Street Beautification Project Phase II\1-Admin\RE-bids\Bid DocumentsWlasterContract <br />Documents\01541- Protection of Property:doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.