My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-253F
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-253F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 2:24:25 PM
Creation date
12/17/2018 10:53:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/13/2018
Control Number
2018-253F
Agenda Item Number
8.F.
Entity Name
Johnson-Davis, Inc.
Subject
Gifford Neighborhood 45th Street Beautification Project Phase II (2)
Area
45th Street Gifford
Project Number
IRC-1748
Bid Number
20190008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01541 <br />PROTECTION OF THE WORK AND PROPERTY <br />with the best information available, but is not guaranteed to be correct or <br />complete. The existing utilities shown on the Contract Drawings are located <br />according to the information available to the ENGINEER at the time the <br />Drawings were prepared and have not been independently verified by the <br />OWNER or the ENGINEER. Guarantee is not made that all existing <br />underground utilities are shown or that the locations of those shown are <br />accurate. The locations shown are for bidding purposes only. Finding the <br />actual location of any existing utilities is the CONTRACTOR's responsibility <br />and shall be done before it commences any work in the vicinity. <br />Furthermore, the CONTRACTOR shall be fully responsible for any and all <br />damages, which might be occasioned by the CONTRACTOR's failure to <br />exactly locate and preserve any and all underground utilities. The OWNER <br />or ENGINEER will assume no liability for any damages sustained or costs <br />incurred because of the CONTRACTOR's operations in the vicinity of <br />existing utilities or structures, nor for temporary bracing and shoring of <br />same. If it is necessary to shore, brace, or swing a utility, contact the utility <br />company or department affected and obtain their permission regarding the <br />method to use for such work. <br />3. Contact the various utility companies which may have buried or aerial <br />utilities within or near the construction area before commencing work. <br />Provide 48 hours minimum notice to all utility companies prior to beginning <br />construction. <br />4. Schedule and execute all work involving existing utilities in order to minimize <br />necessary interruption of services. Whenever such interruption is <br />necessary for completion of the work, notify the ENGINEER and the <br />appropriate utility at least 48 hours in advance. Perform all work to <br />repair/restore utility service to the satisfaction of the appropriate utility. <br />Include all costs related to service maintenance, interruption, and <br />restoration in the appropriate line item in the Contract. <br />5. Where it is necessary to temporarily interrupt house or business services, <br />the CONTRACTOR shall notify the owner or occupant, both before the <br />interruption (24-hour minimum), and again immediately before service is <br />resumed. Before disconnecting and pipes or cables, the CONTRACTOR <br />shall obtain permission from their owner, or shall make suitable <br />arrangement for their disconnection by their owner. <br />6. Explore ahead of trenching and excavation work and uncover all obstructing <br />underground structures sufficiently to determine their location, to prevent <br />damage to them and to prevent interruption of the services which such <br />structures provide. If CONTRACTOR damages an underground structure, <br />restore it to original condition at CONTRACTOR's expense. <br />7. Necessary changes in the location of the Work may be made by <br />ENGINEER, to avoid unanticipated underground structures. <br />8. If permanent relocation of an underground structure or other subsurface <br />facility is required and is not otherwise provided for in the Contract <br />01541-3 FAPublic Works\ENGINEERING DIVISION <br />PROJECTS\1748 Gifford Neighborhood -45th Street Beautification Project Phase II\1-Admin\RE-bids\Bid Documents\Master Contract <br />Documents\01541 - Protection of Property.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.