My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-253F
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-253F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 2:24:25 PM
Creation date
12/17/2018 10:53:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/13/2018
Control Number
2018-253F
Agenda Item Number
8.F.
Entity Name
Johnson-Davis, Inc.
Subject
Gifford Neighborhood 45th Street Beautification Project Phase II (2)
Area
45th Street Gifford
Project Number
IRC-1748
Bid Number
20190008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01710 <br />SITE CLEANUP AND RESTORATION <br />1.1 SCOPE <br />Furnish all labor, equipment, appliances, and materials required or necessary to <br />clean up and restore the site after the construction is completed. <br />1.2 REQUIREMENTS <br />A. During the progress of the project, keep the work,and the adjacent areas <br />affected thereby in a neat and orderly condition. Remove all rubbish, <br />surplus materials, and unused construction equipment. Repair all <br />damage so that the public and property owners will be inconvenienced as <br />little as possible. <br />B. Provide onsite containers for the collection of waste materials, debris, and <br />rubbish and empty such containers in a legal manner when they become <br />full. <br />C. Where material or debris has been deposited in watercourses, ditches, <br />gutters, drains, or catch -basins as a result of the CONTRACTOR's <br />operations, such material or debris shall be entirely removed and <br />satisfactorily disposed of during the progress of the work, and the ditches, <br />channels, drains, etc., shall be kept clean and open at all times. <br />D. Before the completion of the project, unless otherwise especially directed <br />or permitted in writing: <br />1. Tear down and remove all temporary buildings and structures; <br />2. Remove all temporary works, tools, and machinery, or other <br />construction equipment furnished; <br />3. Remove all rubbish from any grounds occupied; and <br />4. Leave the roads, all parts of the premises, and adjacent property <br />affected by construction operations, in a neat and satisfactory <br />condition. <br />E. Restore or replace any public or private property damaged by construction <br />work, equipment, or employees, to a condition at least equal to that <br />existing immediately prior to the beginning of the operations. To this end, <br />the CONTRACTOR shall restore all highway, roadside, and landscaping <br />work within any right-of-way, platted or prescriptive. Acceptable materials, <br />equipment,and methods shall be used for such restoration. <br />F. Thoroughly clean all materials and equipment installed and on completion <br />of the work, deliver the facilities undamaged and in fresh and new - <br />appearing condition.` <br />01710 Site Cleanup <br />01710-1 . . <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1748 Gifford -Neighborhood,- 45th Street Bea utification.Project Phase II\1-Admin\RE-bids\Bid <br />DocumentsWlaster Contract Documents\01710 -Site Cleanup.doC. <br />