My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-253F
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-253F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 2:24:25 PM
Creation date
12/17/2018 10:53:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/13/2018
Control Number
2018-253F
Agenda Item Number
8.F.
Entity Name
Johnson-Davis, Inc.
Subject
Gifford Neighborhood 45th Street Beautification Project Phase II (2)
Area
45th Street Gifford
Project Number
IRC-1748
Bid Number
20190008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. It is the intent of the Specifications to place the responsibility on the <br />CONTRACTOR to restore to their original condition all items disturbed, <br />destroyed, or damaged during construction. Particular attention will be <br />placed on restoration of canals to equal or better condition than prior to <br />construction. <br />H. When finished surfaces require cleaning with cleaning materials, use only <br />those cleaning materials which will not create hazards to health or <br />property and which will not damage the surfaces. Use cleaning materials <br />only on those surfaces recommended by the manufacturer. Follow the <br />manufacturer's directions and recommendations at all times. <br />I. Keep the amount of dust produced during construction activities to a <br />minimum. At CONTRACTOR's expense, spray water or other dust control <br />agents over the areas, which are producing the dust. Schedule <br />construction operations so that dust and other contaminants will not fall on <br />wet or newly coated surfaces. <br />1.3 SITE CLEANUP AND RESTORATION <br />Prior to final completion, the OWNER, ENGINEER, INDIAN RIVER FARMS <br />WATER CONTROL DISTRICT, and CONTRACTOR shall review the site with <br />regards to site cleanup and restoration. Clean and/or restore all items <br />determined to be unsatisfactory by the OWNER or ENGINEER, at no additional <br />expense. <br />+ + END OF SECTION + + <br />01710 Site Cleanup . <br />01710-2 _. <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1748 Gifford Neighborhood - 45th Street Beautification Project Phase II\1-Admin\RE-bids\Bid <br />DocumentsWaster Contract Documents\01710 - Site. Cleanup.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.