My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-253F
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-253F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 2:24:25 PM
Creation date
12/17/2018 10:53:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/13/2018
Control Number
2018-253F
Agenda Item Number
8.F.
Entity Name
Johnson-Davis, Inc.
Subject
Gifford Neighborhood 45th Street Beautification Project Phase II (2)
Area
45th Street Gifford
Project Number
IRC-1748
Bid Number
20190008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item of Payment. <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 711-11-123 — Thermoplastic (Standard) (White) (Solid) (12") — Per <br />Linear Foot <br />Bid Item No. 711-11-125 — Thermoplastic (Standard) (White) (Solid) (24") — Per <br />Linear Foot <br />Bid Item No. 711-11-221 — Thermoplastic (Standard) (Yellow) (Solid) (6") — Per <br />Linear Foot <br />SECTION 730 — TEMPORARY PUMPING SYSTEM <br />The Contractor shall provide temporary dewatering equipment meeting the minimum <br />capacities identified necessary to manage stormwater flows within the Indian River <br />Farms Water Control District canal system. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 730-89 — Temporary Pumping System (Type A) (8,500 GPM Min.) — <br />Per Lump Sum <br />Bid Item No. 730-90 — Temporary Pumping System (Type B) (37,700 GPM Min.) — <br />Per Lump Sum <br />Bid Item No. 730-91 — Temporary Pumping System (Type C) (16,600 GPM Min.) — <br />Per Lump Sum <br />SECTION 999 — RECORD DRAWINGS /AS -BUILT DRAWINGS <br />GENERAL <br />Maintain, prepare and provide'the ENGINEER with record documents as specified below, <br />except where otherwise specified or modified within the scope of work provided in the <br />specific project contract documents. The Contractor and/or Developer shall be responsible <br />for, and required to provide, Record Drawings as outlined in this section. <br />MAINTENANCE OF RECORD DOCUMENTS: <br />1. Maintain in CONTRACTOR's field office in clean, dry, legible condition <br />complete sets of the following project documents: Drawings, Specifications, <br />Addenda, approved Shop Drawings, samples, photographs, Change Orders, <br />other modifications of Contract Documents, test records, survey data, Field <br />Orders, and all other documents pertinent to CONTRACTOR'S Work. <br />2. Provide files and racks for proper storage and easy access. <br />3. Make documents available at all times for inspection by ENGINEER and <br />OWNER. <br />01025-23 Technical Specifications <br />FAPublic Wo*s\ENGINEERING DIVISION PROJECTS\1748 Gifford Neighborhood.- 45th Street Beautification Project Phase I\1- <br />Admin\RE-bids\Bid Documents\Master Contract Documents\Technical Specifications OMATED 5-25 2017.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.