My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-253F
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-253F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 2:24:25 PM
Creation date
12/17/2018 10:53:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/13/2018
Control Number
2018-253F
Agenda Item Number
8.F.
Entity Name
Johnson-Davis, Inc.
Subject
Gifford Neighborhood 45th Street Beautification Project Phase II (2)
Area
45th Street Gifford
Project Number
IRC-1748
Bid Number
20190008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bid Item No. 1080-32-108 — Utility Fixture — Sample Point, F&I, 8" <br />— Per Each <br />Bid Item No. 1080-33-108 — Utility Fixture — Cap, Furnish & Install 8" <br />— Per Each <br />SPECIAL SPECIFICATION <br />SECTION 1050-18-724 - UTILITY PIPE. PLUG & PLACE OUT OF SERVICE, 8-19.9" <br />1. DESCRIPTION <br />This item will govern the grouting of existing water mains for the purposes of abandonment <br />underneath roadways, paved areas, and at other designated locations. The location of this <br />Work is as shown on the Contract Document plans and/or as encountered in the field <br />during construction. The Contractor will, unless otherwise specified, furnish all labor, <br />materials, equipment, tools and all other. appurtenances necessary to abandon water lines <br />segments in place by filling them with flowable cementious low strength grout including <br />plugs, bulkheads, excavation and backfill at locations as required to completely fill the line <br />to be abandoned in place with grout to protect against future collapse of the line. <br />2. SUBMITTALS <br />A. Proposed Mix Design Report <br />B. Submit manufacturers data for proposed plugs and detail of bulkhead <br />C. Technical information for equipment and operations procedures including <br />projected injection rate, grout pressure, method of controlling grout <br />pressure, bulkhead and vent design and number of stages of grout <br />application. <br />D. Submit project specific plan for abandonment at least 15 days prior to <br />commencing grouting activities, describe proposed sequence and other <br />information pertinent to completion of Work. <br />3. MATERIALS <br />A. Cement -based grout/ flowable fill with self -leveling and non -shrink <br />characteristics. <br />B. Unconfined compressive strength: Minimum 100 psi at 56 days as <br />determined based on average of three tests for same placement. <br />01025-34 <br />Technical Specifications <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1748 Gifford Neighborhood - 45th Street Beautification Project Phase II\1- <br />Admin\RE-bids\Bid Documents\Master Contract Documents\Technical Specifications uPDATED 5-25-2017.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.