Present at least three acceptable strength tests for proposed mix <br />design in mix design report. <br />4. CONSTRUCTION <br />Abandoning and grouting of water lines must not occur until all existing water mains and <br />services have been transferred to a relocated water line or another line as designated in the <br />Contract Documents. The Contractor will be responsible for the satisfactory coordination of <br />the pipe abandonments with other construction and activities in the area. Delays in work <br />resulting from lack of coordination will not be cause for additional compensation. Any work <br />involving or impacting asbestos concrete pipe must be in accordance with the procedures <br />outlined in the approved specifications for this project and will comply with all federal, state, <br />and local laws, ordinances and regulations regarding the management of asbestos <br />containing materials. <br />Remove all water line appurtenances, such as hydrants, valves and valve casing and <br />castings. These appurtenances must be returned to the designated utility representative. <br />Make cuts, install bulkheads, vents to allow for air release. <br />Remove any free-standing water prior to starting fill replacement. <br />Place grout/flowable fill using concrete or grout pumps capable of continuous delivery at <br />planned placement rate to fill volume between placement points not to exceed 500 linear ft. <br />at a time. Pump flowable fill through_ bulkheads constructed for placement of PVC pipes or <br />other methods to contain grout in line to be abandoned. These pipes will be used for <br />injection points or vents during placement. Place grout under pressure into property <br />vented open system until grout emerges from vent pipes indicating pipe is completely filled. <br />Pumping grout must be completed under sufficient pressure to overcome friction and to fill <br />water main from downstream to upstream end. Remediate areas where flowable fill did not <br />fill voids in water main by pressure grouting from inside water main or from surface if <br />necessary. Plug each end of the water main being abandoned. Ensure that concrete is <br />around plug/bulkhead and around pipe including bedding area such that it is not penetrable <br />by groundwater and that bedding at this location is not a conduit for groundwater. The <br />method of installation must be able to meet the requirement of completely filling the existing <br />water main and any voids adjacent to it. <br />Backfill to grade above pipe left in place. Place and compact backfill in compliance with the <br />Standard Specifications. <br />Remove, transport, and, dispose of spoils. Spoils including pipe must be hauled to a facility <br />permitted to accept the material. The method must provide for the release of air. When <br />intermediate points are required to be constructed for the abandonment of the system, <br />they must be a part of the abandonment project process. The method must provide for the <br />01025-35 Technical Specifications <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1748 Gifford Neighborhood - 45th Street Beautification Project Phase II\1- <br />Admin\RE-bids\Bid DocumentsWaster Contract Documents\Technical Specifications uPDATED 5-25-2017.doc <br />