My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-253F
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-253F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 2:24:25 PM
Creation date
12/17/2018 10:53:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/13/2018
Control Number
2018-253F
Agenda Item Number
8.F.
Entity Name
Johnson-Davis, Inc.
Subject
Gifford Neighborhood 45th Street Beautification Project Phase II (2)
Area
45th Street Gifford
Project Number
IRC-1748
Bid Number
20190008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pg.3 Initis 7 <br />9. Permittee, as a condition to the continuance of this Permit, shall reimburse District <br />immediately upon demand, for any testing or other costs or expenses to District associated <br />with or arising from Permittee's use of District facilities. <br />10. Applicant is cautioned that electrical, water and sewer, or other installations or <br />utilities may be located within the construction area, and applicant shall use diligent <br />efforts to first detect and locate all such installations and shall coordinate construction <br />with all other lawful users of said right-of-way. Applicant shall be liable for all damages <br />proximately resulting from its interference with or interruption of services provided by <br />other lawful right-of-way users. <br />11. This permit shall be considered to be a license only, for the limited purpose of <br />installation, placement and maintenance of the improvements specified on the face <br />bereof, and does not convey arty other right, title or interest of the District in the subject <br />right-of-way property. <br />12. An as-built/location certification of all culvert/structure installations within the District's <br />canals/right-of-way shall be performed by a Florida Registered Professional surveyor and <br />Mapper on form provided by the District, and submitted to the District within thirty (30) <br />days following completion of installation. If as -built certification is not received Mithin <br />thirty days Of installation the District will either have certification completed at <br />owner/applicants expense or order renwval of the installation. <br />By initialing and dating this page I am agreeing to all standard and special provisos: <br />Initial Date- /�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.