My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-253F
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-253F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 2:24:25 PM
Creation date
12/17/2018 10:53:55 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/13/2018
Control Number
2018-253F
Agenda Item Number
8.F.
Entity Name
Johnson-Davis, Inc.
Subject
Gifford Neighborhood 45th Street Beautification Project Phase II (2)
Area
45th Street Gifford
Project Number
IRC-1748
Bid Number
20190008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIAL CONDITIONS FOR PERMIT NO. 17-35 <br />FOR <br />45TH STREET BEAUTIFICATION PROJECT <br />(ENCLOSURE OF SUB -LATERAL H-3 CANAL FROM <br />43" AVENUE TO LATERAL H CANAL) <br />1) This permit is issued based on plans prepared by Kimley-Horn, signed and <br />sealed by Brian Good, P.E., dated December 8, 2017. <br />2) Drainage within Sub -lateral H-3 (45t' Street) Canal and within Lateral "H" <br />Canal shall be maintained at all times. <br />To provide a 2" per .24 hour discharge capacity Sub -lateral H-3 (451h Street) <br />Canal will require a by-pass pumping capacity of 9,000 G.P.M. at the westerly <br />(upstream) end of project, increasing to 16,600 G.P.M. pumping capacity at <br />easterly end of project. The proposed construction within Lateral "H" Canal <br />will require a by-pass pumping capacity of 37,700 G.P.M. to provide the <br />normal 2" per 24 hour discharge rate from upstream basin. Any construction <br />within they Lateral "H" Canal should only be attempted during the dry season <br />(December thru May). <br />3) Since there is no alternate discharge or outfall for Sub -lateral H-3 and Lateral <br />"H" Canal upstream basins, drainage must be provided and maintained <br />throughout the construction phase to prevent adverse tailwater or flooding <br />conditions upstream of the project site. Any scheduled temporary blockage of <br />the canals shall be coordinated with David E. Gunter, Superintendent of <br />Indian River Farms Water Control District, (Phone -772-562-2141) on a day- <br />to-day basis. <br />4) If a storm event occurs that exceeds any by-pass pump conveyance capacity, <br />or it is deemed a necessity for flood control by a representative of the Indian <br />River Farms Water Control District, the Contractor shall be prepared to and <br />shall remove any temporary berm, sheeting, etc. blocking said canal <br />immediately following such notification. <br />5) As set -forth in Standard Provisos No. 1 of this permit, the Permittee assumes <br />full responsibility for any construction and operations within the District's <br />canal and right-of-way associated with the issuance of this permit including <br />increased tail-water/flood stages upstream of the project site, and shall save <br />and hold harmless the District from any expense, loss, damage or claim in <br />regards thereto. <br />
The URL can be used to link to this page
Your browser does not support the video tag.