JOHNSON-DAVIS, INC. <br />863 S. Kings Hwy <br />Bid Number 2019008 Forl Pierce, FL 34945 <br />Addendum No. 1 Phone (772) 468-9200 <br />Fax (772) 468-9202 Page 2 of 2 <br />removal of unsuitable material. That Pay Item 110-7-2 does not exist on the Itemized bid Schedule. The pay <br />item footnote description associated with pay item 110-7-2 is correct, but should be identified as pay item <br />120-4 "Subsoil Excavation & Backfill Replacement". There is no pay item 110-7-2. <br />6. General Conditions section 13.03 subpart D is in conflict with Division 1 General Requirements section 1215 <br />subpart 1.2 with regard to inspection cost responsibilities; which takes precedence? Section 1215 subpart <br />1.2 conveys General Quality Control that the County has for its independent verification testing services, <br />Subpart 1.1 directly states, "This section does not specify or modify the OWNER and ENGRINEER duties <br />relating to quality review and Contract surveillance". Section 13.03 subpart D conveys the Contractor's <br />responsibility to provide all Quality Control testing required to comply with the terms of the Contract. The <br />Owner will provide its own verification inspection, in addition to the Contractor's Quality Control testing, <br />to ensure compliance with contract. In the case of where verification testing/inspection shows non- <br />compliance with the Contract requirements the Contractor may be held liable for testing costs the Owner <br />has incurred directly related to the failing test in addition havingto remedy whatever failure was indicated. <br />7. Is there a tree disposition plan to identify removal, protection, and transplantation requirements? No. Refer <br />to General Note 10. <br />8. Is there an Irrigation Plan for this project? Refer to Landscape General Note 21. <br />9. Would the IRFWCD be willing to substitute earthen coffer dams, in lieu of driven sheet steel, only within the <br />applicable sub -lateral canals, using best SWPP practices, due to schedule and cost considerations? Refer to <br />General Note 18. <br />10. Shall unsuitable soil generated from the initial desilting of the subject canals be categorized as Subsoil <br />Excavation? Any unsuitable material removed during clearing and grubbing activities and/or indicated <br />excavation is not quantified as subsoil excavation. <br />*************This Addendum must be acknowledged where indicated on the bid form and/or by return of this <br />Acknowledgement with your submittal package ************ <br />Company Name <br />Name: <br />Johnson -Davis In <br />Scott J. Johnson <br />(Type / Printed) <br />Authorized Signature: <br />Title: President <br />Date: 10/24/2018 <br />Telephone: 772-468-9200 Email: sjohnson@johnsondavis.com <br />