Laserfiche WebLink
AGREEMENT <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the State of Florida <br />organized and existing under the Laws of the State of Florida, (hereinafter called OWNER) <br />and Green Construction Technologies, Inc. <br />(hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the mutual covenants <br />hereinafter set forth, agree as follows: <br />ARTICLE 1 - WORK <br />CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is <br />generally described as follows: <br />This beautification project consists of the installation of landscaping improvements within the medians <br />of US Highway 1 between Oslo Road and the South County line. This project includes clearing and <br />grubbing, placement of a soil amendment layer, and planting a total of 10,S68 trees, shrubs, and ground <br />cover plants. <br />In order to be eligible to complete this project, the contractor must be a FDOT pre -qualified Landscaping <br />Contractor. For a list of FDOT pre -qualified Landscaping Contractors in Florida, please visit the following <br />link and type LANDSCAPING into the 'Enter Work Class' box: <br />https.11fdotwpl. dot. state. fl. us/contractorprequalification/public/Prequalified VendorSearch. aspx <br />All work performed by the contractor under this contract shall conform to the applicable Florida <br />Department of Transportation (FDOT) Design Standards FY2018-19. <br />h ttp://www. fdot. govldesignlstandardplans/DS. shtm <br />FDOT Standard Specifications for Road and Bridge Construction July 2018. <br />http://www.fdot. gov/progrommanagement/Implemented/SpecBooks/ <br />ARTICLE 2 -THE PROJECT <br />The Project for which the Work under the Contract Documents may be the whole or only a part is generally <br />described as follows: <br />Project Name: US HIGHWAY 1 LANDSCAPING —SOUTH COUNTY LINE TO OSLO ROAD <br />(IRC -1631) <br />Bid Number: 2019016 <br />ARTICLE 3 - CONTRACT TIMES <br />3.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final <br />payment as stated in the specifications are of the essence of the Agreement. <br />F:\Purchasing\Bids\2018-2019 FY (2019000)\2019016 Rebid - US 1 Landscaping\IRC-1631_AGREEMENT.docx <br />