My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-290
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-290
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 3:13:52 PM
Creation date
12/27/2018 3:47:11 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/18/2018
Control Number
2018-290
Agenda Item Number
8.N.
Entity Name
Coastal Waterways Design and Engineering
Subject
Round Island Park Emergency Beach Access
Alternate Name
Work Order No. 2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County CCCL - Round Island Beach Access <br />December 4, 2018 <br />Page 4 of 6 <br />park entrance. COASTAL WATERWAYS shall provide FDOT' approved design <br />details and cost estimate for'work in the state road ROW along State Road A -1-A. <br />Task 3d - DEP Permit and iCounty Approval Processing: COASTAL <br />WATERWAYS will represent the project before DEP and County permit review <br />staff towards obtaining permits for the work consistent with the design approved <br />by the COUNTY in Task 2. COASTAL WATERWAYS will contact FDEP and <br />County staff to address staff questions and concerns and to expedite their review <br />and processing of the permit application. COASTAL WATERWAYS will confer with <br />the COUNTY as to (a) interpretation of FDEP and County rules and regulations, <br />and (b) responses to any FDEP and County staff .requests for additional <br />information. COASTAL WATERWAYS will provide written responses to DEP and <br />County staff to address staff requests for additional information. COASTAL, <br />WATERWAYS will represent the project before FDEP and County staff toward <br />securing approval of permits for the project. <br />Additional surveys, studie's or analysis not identified may be required by the <br />agencies. These surveys/studies/analysis are beyond the scope of this work. Upon <br />request by the FDEP for. additional surveys/studies/analysis, COASTAL <br />WATERWAYS will submit a separate proposal requesting the COUNTY's <br />authorization for these additional services. <br />Task 4 - Construction Administration Services: COASTAL WATERWAYS will <br />assist the. COUNTY with answers to potential bidders questions and assist the <br />COUNTY with issuance of one (1) addendum if necessary. COASTAL <br />WATERWAYS will assist the COUNTY Representative in bidding and negotiating <br />a construction agreement. <br />COASTAL WATERWAYS will conduct an on-site pre -construction meeting with <br />the COUNTY Representative and the selected contractor. COASTAL <br />WATERWAYS will review shop drawings and up to two (2) change orders if <br />necessary. COASTAL WATERWAYS will make up to five (5) daily site observation, <br />additional daily site observations will be negotiated at our hourly rates if deemed <br />necessary. Daily site observations shall include identifying that the Contractor is <br />performing the scope of work in accordance with the plans, specifications and <br />permits. In addition, COASTAL WATERWAYS will make a final site observation <br />and submit a certification to the regulatory agencies to identify conformance of the <br />project. to the specifications, plans and permit. <br />Engineering, Floodplain & Emergency Management Solutions within our Coastal and Marine Environment <br />
The URL can be used to link to this page
Your browser does not support the video tag.