Laserfiche WebLink
CONSULTANT will prepare well installation logs. CONSULTANT will perform in-situ permeability <br />testing on three of the new monitor wells in accordance with Section 2.2.4 of the CEP. <br />After installation of the wells, CONSUTLANT will contract with Masteller, Moler, and Taylor, Inc. <br />(MMT) to survey the well locations including horizontal locations and vertical elevation of the top <br />of casing. CONSULTANT/MMT will provide a signed/sealed letter with the survey data. <br />CONSULTANT will contract with Ideal Tech Services Inc. (ITS) to perform groundwater sampling <br />and measurements of water levels. The sampling and measurements of water levels are <br />summarized below along with the analysis required: <br />• Existing MW -21S and MW -49S sampled and analyzed for parameters listed in Table 2 of CEP. <br />• New wells MW -50S, MW -51S, MW -52S, MW -33S, MW -35S, and MW -40S sampled and analyzed <br />for analytes listed in Table 2 of CEP. <br />• Remaining shallow detection wells for the C&D Debris Disposal Facility (MW -17S, MW -18S, <br />MW -19S, and MW -20S) will be sampled and analyzed for naphthalene. <br />• Surface water samples from 3 locations in the Lateral C Canal and analyzed for parameters <br />listed in Table 2 of CEP. <br />• Sediment samples from 3 locations along the Lateral C Canal and analyzed for parameters listed <br />in Table 2 of CEP, as possible based on available analytical methods. <br />• Water level measurements from 10 detection wells, the six new wells, and MW -49S. <br />CONSULTANT/ITS will deliver the samples to the COUNTY contract laboratory (ENCO) Orlando <br />office for analysis. <br />Subtask 1.2 - Analysis and Data Review <br />Unless otherwise determined by the COUNTY, ENCO will perform the laboratory analysis under the <br />COUNTY's contract. CONSULTANT will assist the COUNTY in coordinating the analytical testing <br />activities with ENCO. CONSULTANT will notify FDEP prior to sampling. After receipt of laboratory <br />results, CONSULTANT will review and evaluate the analytical test results. CONSULTANT will <br />coordinate with ENCO on any corrections to the analytical test reports. <br />Subtask 1.3 - Contamination Evaluation Report <br />In accordance with the CEP and after receipt of all analytical results, CONSULTANT will prepare a <br />Contamination Evaluation Report that includes: <br />• Background information including results of previous investigations and monitoring. <br />• A description of work performed including well installation, well logs, sampling locations, and <br />sampling methods. <br />• Summary tables of well construction details, groundwater analytical results (including historical <br />data), water -level data, surface water quality data, in-situ permeability results and hydraulic <br />conductivity determinations, well inventory, and survey results. <br />IN A map or maps showing the location of groundwater wells, groundwater contour maps including <br />the rate and direction of groundwater movement, applicable groundwater iso -concentration <br />maps, and surface water sampling locations with results. <br />Smith <br />A-2 <br />jj2388_WO No. 2.docx <br />