My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/04/2018
CBCC
>
Meetings
>
2010's
>
2018
>
12/04/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 12:49:52 PM
Creation date
2/6/2019 10:16:40 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/04/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8- ". <br />INDIAN RIVER COUNTY, FLORIDA <br />BOARD MEMORANDUM <br />TO: Jason E. Brown <br />County Administrator <br />THROUGH: Richard B. Szpyrka, P.E. <br />Public Works Director <br />THROUGH: James D. Gray, Jr., M.S. <br />Natural Resources Manager <br />FROM: Kendra Cope, M.S. <br />Environmental Specialist <br />SUBJECT: Work Order No. 2018006-4, Aptim Environmental & Infrastructure, Inc. <br />Sector 3 Beach and Dune Renourishment — 2018 Pre -Construction <br />Biological Monitoring <br />DATE: November 19, 2018 <br />BACKGROUND <br />On January 9, 2018, the Board approved a contract with Aptim Environmental & Infrastructure, <br />Inc. (Aptim) for professional coastal engineering and biological support services related to the <br />management and renourishment of the Sector 3 (Wabasso Beach) beach project area. <br />The Sector 3 project area is a critically eroded 6.6 -mile section of shoreline that extends from the <br />Seaview Subdivision south to the Turtle Trail beach park. The Sector 3 project area sustained <br />damage from Hurricane Matthew (2016) and Irma (2017) creating the need for repair. <br />DESCRIPTION AND CONDITIONS <br />The proposed Work Order No. 2018006-4 provides year 2018 pre -construction biological <br />monitoring services to map nearshore hardbottom prior to the construction of the Sector 3 <br />renourishment project. These services will provide a baseline comparison with post -construction <br />hardbottom edge maps and reports. By Permit, Pre -Construction Biological monitoring is <br />required prior to a large-scale beach restoration project. <br />Work Order No, 2018006-04 is for a lump sum amount of $150,613.60. Services provided include: <br />• Mapping of edge of nearshore hardbottom <br />• Installation of permanent transects <br />• Monitoring of these established transects <br />All subsequent annual biological monitoring of the Sector 3 Project area will be addressed <br />through future work orders. <br />Page 2 <br />BCC Agenda Item 174 <br />C:\Users\legistar\AppData\Local\Temp\BCL Technologies\easyPDF 8\@BCL@980EF I FC\@BCL@980EF 1 FC.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.