ATKI N S <br />St. Johns River Water Management District (SJRWMD) Permit Exemption Request: <br />The Consultant shall prepare and submit a request for permit exemption for the proposed <br />improvements. It is assumed that this project will qualify for an exemption under F.A.C. Chapter 62- <br />330.05 Exempt Activities (c) Minor roadway safety construction, alteration, or maintenance and <br />operation. <br />3. Florida Department of Transportation (FDOT) General Use Permit: <br />The Consultant shall prepare and submit a General Use Permit application to FDOT for the proposed <br />improvements within FDOT Right of Way. The submittals will occur at the 90% and 100% design <br />stage. Comments from FDOT staff on the 90% submittal will be incorporated into the 100% plans <br />and the Consultant will provide a written response to each comment. It is assumed that the 100% <br />submittal will be approved by FDOT. <br />4. Utility Notification and Coordination: <br />The Consultant will coordinate with local utility providers including FP&L, AT&T, Bright House <br />Networks, NUI City Gas Company, County and Town Utility department to obtain available <br />information regarding existing utilities within the proposed project limits. The Consultant will provide <br />a Notice to Utility Owner Providers of the proposed improvements. Upon request by the County a <br />record of email delivery confirmation to each utility provider will be provided to the County. The <br />Consultant will provide a copy of each submittal (60%, 90% and 100%) to the utility providers <br />identified by Sunshine State One Call of Florida with a request for plan markups from the utility. The <br />Consultant will also attend a Utility Coordination Meeting at the County following the 60% and 90% <br />submittal (2 total) during the design phase to review utility conflicts that have been identified by the <br />utility provider or determined during the design phase. It is anticipated that only minor utility and <br />hydrant adjustments will be required, and those adjustments will be shown on the plans. Utility design, <br />utility adjustment plans and utility main relocation is not included in this scope of work. <br />TASK 7: BID PHASE SERVICES <br />Following approval of the Final Construction Documents the Consultant will prepare bid documents to the <br />County consisting of the approved construction drawings and the project technical specifications issued for <br />bid. The Consultant will also edit Division 0 and 1 specifications provided by the County in MS Word <br />format to insert project specific information in these sections, including the bid schedule. It is assumed that <br />only minor project specific information editing of Division 0 and 1 specifications will be required. The <br />Consultant will also: <br />1. Attend a pre-bid meeting. <br />2. Prepare answers to questions submitted by potential bidders to the County (7 calendar day review <br />period). Estimated level of effort is based on providing one combined response of all questions <br />submitted to and compiled by the County. <br />3. Assist the County with preparing bid addendums for technical items (one bid addenda is assumed). <br />4. Review and make recommendations to County regarding acceptance of the low bid contractor's <br />Schedule of Values. <br />Following bid submittal, the Consultant will review the submitted bids and provide a recommendation for <br />award to the County. <br />February 14, 2019 <br />Page 5 of 10 <br />