My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-038
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:17:29 PM
Creation date
3/7/2019 3:26:55 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/05/2019
Control Number
2019-038
Agenda Item Number
8.I.
Entity Name
Atkins North America. Inc.
Subject
6th Avenue resurfacing
Area
6th Avenue from US HIghway 1 to 21st Street
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATKINS <br />SECTION 2 ASSUMPTIONS AND EXCLUSIONS <br />1. Application fees, impact fees and any other fees required by regulatory agencies are considered a direct <br />expense to the County. <br />2. The following assumptions apply to this scope of services: <br />• The County has supplied legal descriptions of parcels fronting the Right of Way via 9/25/2018 <br />email with FTP site link. <br />• The proposed facilities will not require relocation of major utility facilities, including power, <br />communications, water, sewer and gas. Design and permitting of major utility relocation is <br />assumed to be by the utility provider and is not included in this proposal. <br />• It is assumed pavement resurfacing will be based on standard County pavement section, <br />detailed pavement design is not included in this scope of services. <br />• Any lane sharing will be accomplished by pavement marking "Sharrows", lane narrowing and <br />adding additional lanes, including bike lanes or lanes adjacent to the travel lane is not included <br />in this proposal. <br />• Drainage, grading, and utility adjustment information will be shown on the roadway plan <br />sheets. <br />• ITS conduit information will be shown on the roadway plan set. <br />• The Contractor will be responsible for preparation and submittal of a Maintenance of Traffic <br />(MOT) Plan to the County for approval prior to construction. No MOT details will be included <br />in the Construction Plans. <br />• The Contractor will be responsible for preparation and submittal of the FDEP NOI for the <br />project prior to construction and N.O.T. upon completion of construction. <br />• It is assumed that no changes or upgrades to existing pedestrian crossing signals are required <br />and that structural analysis of existing strain poles is not required. <br />• It is assumed the County will schedule the Utility Coordination Meetings. <br />• FDOT General Use Permitting assumes one submittal and one response to comments. <br />Additional submittals are not included in this scope of work. <br />• The Contractor shall provide an as -built survey, prepared by a land surveyor registered in the <br />State of Florida, to the County and Atkins. <br />• Task 7 Bid Phase services is assumed to last approximately two months from submittal of Issue <br />for Bid documents to the County. <br />3. Design and permitting of any offsite improvements, are not included in this proposal. <br />February 14, 2019 <br />Page 6 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.