My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-038
CBCC
>
Official Documents
>
2010's
>
2019
>
2019-038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 12:17:29 PM
Creation date
3/7/2019 3:26:55 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATKINS <br />4. FDOT standard structures will be specified for all proposed drainage structures. The structural design <br />of special structures that may be required to address special design conditions or conflicts is not <br />included in this scope. <br />5. The following items are not included in this scope of work: <br />• Traffic Signal Warrant, Traffic Planning, Traffic Studies and ITS design. <br />• Additional Geotechnical Investigations not specified in Task 2 of this scope of services, <br />• Subsurface Utility Engineering (SUE), including soft digs and utility locates. <br />• Profile Drawings of the proposed improvements. <br />• Stormwater management system design and permitting. <br />• Additional City of Vero Beach, SJRWMD and FDOT permitting not specified in Task 6 <br />of this scope of services <br />• ACOE and FEMA and FDEP permitting is considered an additional service. <br />• Utility design, utility adjustment plans and utility main relocation (except for minor utility <br />service or hydrant adjustments). <br />• Easements and land acquisition support services. <br />• Division 0 and 1 Specification preparation (except as specified in the scope) and legal <br />review. <br />• Maintenance of Traffic (MOT) Plans and MOT Details. <br />• Evaluation of Contractors Means and Methods or alternative designs for components <br />proposed by Contractor. <br />• Construction phase services, including pre -construction meeting, review of shop drawings, <br />responses to requests for information (RFI's), review of change orders, pay application <br />reviews, site inspections, as -built survey review, certification of completion and record <br />drawings. <br />February 14, 2019 <br />Page 7 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.